Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Safety

    Pope Leo XIV’s ethical mining call: key ESG takeaways for project teams

    January 26, 2026|

    Reviewed by Tom Sullivan

    Pope Leo XIV’s ethical mining call: key ESG takeaways for project teams

    First reported on MINING.com

    30 Second Briefing

    Pope Leo XIV met more than a dozen mining and energy leaders at the Vatican, including BHP’s Mike Henry, Vale’s Gustavo Pimenta, Ivanhoe Mines’ Robert Friedland and Sigma Lithium’s Ana Cabral, to press for “integral ecology” and stricter ethical standards in resource extraction. The session, under the Building Bridges Initiative and linked to projects such as Borgo Laudato Si’, focused on human rights, decent work and environmental justice in critical minerals supply chains. Leo cited coltan from the DRC as emblematic of minerals enabling modern devices but tied to paramilitary violence, child labour and community displacement.

    Technical Brief

    • Building Bridges Initiative used as the formal mechanism to connect corporate project decisions with social-licence expectations.
    • Borgo Laudato Si’ cited as a vehicle to translate ethical principles into site-level engagement processes.
    • Leo’s “ethic of responsibility” language pushes boards to integrate human-rights risk alongside traditional HSE risk registers.
    • Coltan extraction in the DRC singled out, linking mine security, paramilitary control and community displacement to supply-chain due diligence.
    • For mine operators, the discussion signals tighter scrutiny of critical-mineral sourcing, contractor oversight and community-impact auditing beyond statutory compliance.

    Our Take

    BHP’s presence in these Vatican discussions comes as it is reporting record Australian iron ore and copper output and committing US$8.4 billion to Jansen potash, so any ethical or sustainability expectations raised here will have leverage over a very large current and future production base.

    The focus on cobalt, copper, lithium and rare earths aligns with other Policy coverage in our database where Chile and other producers are reworking governance around copper and lithium, signalling that ethical supply expectations are increasingly being set at both political and now faith-based global fora.

    In our database, BHP is one of the few majors appearing simultaneously in sustainability-tagged rehabilitation pieces (such as Mt Arthur Coal closure works) and in high-growth copper and iron ore stories, suggesting it is under particular scrutiny to translate high-level ethical mining dialogues into concrete project-level closure and community practices in regions like Africa and Latin America.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Project Vault and US$12bn stockpile: regulatory takeaways for mine planners
    Policy
    about 6 hours ago

    Project Vault and US$12bn stockpile: regulatory takeaways for mine planners

    Project Vault will create a US$12 billion US critical minerals stockpile, combining US$1.67 billion in private capital with a US$10 billion Export-Import Bank loan to buy and store materials for automakers, tech firms and other industrial users. Following a Section 232 probe covering the full USGS critical minerals list plus uranium, the administration found imports threaten national security but chose negotiated price floors and trade mechanisms over tariffs. Forthcoming US–Mexico and US–EU–Japan action plans, under the new FORGE framework, will define which minerals are prioritised, how any border-adjusted price floor is calculated, and how rules of origin or downstream products are treated.

    BC investor’s C$500k mining misrepresentation fine: compliance lessons for project teams
    Policy
    about 7 hours ago

    BC investor’s C$500k mining misrepresentation fine: compliance lessons for project teams

    British Columbia investor Varandeep Singh Grewal has agreed to pay C$500,000 and accept a 10‑year ban from acting as a registrant, promoter or securities market consultant after the BC Securities Commission found he facilitated misleading investor relations for a supposed mineral exploration startup. Over two months in 2018, a third‑party IR provider, arranged by Grewal, claimed the company was actively mining, producing minerals and using “state‑of‑the‑art, environmental‑friendly” technology, when it in fact remained purely in the exploration phase with no such infrastructure. The case signals tighter scrutiny of promotional claims around early‑stage mining projects, particularly where production and proprietary technology are asserted without evidence.

    Gateway 3 delays and 5,000 empty homes: regulatory lessons for project teams
    Policy
    about 17 hours ago

    Gateway 3 delays and 5,000 empty homes: regulatory lessons for project teams

    Delays at the Building Safety Regulator’s Gateway 3 stage are linked by law firm Irwin Mitchell to 44 undecided schemes and 5,594 completed higher-risk residential units remaining unoccupied, with one case waiting 550 days against an eight‑week target. Of 158 Gateway 3 applications in 2023, 55 took more than three months for a decision, raising concerns over cashflow impacts on developers and handover timing for residents. The BSR disputes the interpretation, stating no new-build higher-risk building that passed Gateway 2 has yet applied for Gateway 3 and that current cases are mainly transitional legacy projects with significant safety issues.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.