Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Product
    Sustainability
    Projects

    Metso–Loesche VRM dry grinding: design and water-risk takeaways for mine engineers

    March 12, 2026|

    Reviewed by Tom Sullivan

    Metso–Loesche VRM dry grinding: design and water-risk takeaways for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    Metso has partnered with Loesche GmbH to launch a vertical roller mill (VRM) dry grinding solution targeting higher energy efficiency and reduced water use in comminution circuits. The system combines Metso’s process integration and plant design with Loesche’s VRM technology, which typically delivers fine grinding in a single, compact unit without the need for large downstream classification or thickening equipment. For mine designers, the dry VRM route can shrink plant footprint, simplify tailings handling and support projects in arid regions or where water licences are constrained.

    Technical Brief

    • VRM unit integrates grinding, drying and classifying in one machine, reducing separate equipment trains.
    • Loesche’s mill design uses grinding rollers on a rotating table to generate high compressive forces.
    • Hot gases pass through the mill, enabling simultaneous moisture removal from ore feed.
    • Integrated dynamic classifier on top of the VRM controls product fineness without external cyclones.
    • Circulating load is handled internally within the mill housing, limiting external recirculation conveyors.
    • Compact VRM modules suit retrofit into existing comminution buildings with limited headroom and footprint.
    • Dry VRM circuits can reduce slurry pumping requirements and associated pipeline wear and maintenance.
    • For greenfield mining projects, VRM-based layouts enable simpler elevation profiles and fewer sumps.

    Our Take

    Metso’s work with Loesche GmbH on VRM dry grinding comes as Metso is simultaneously supplying large-scale wet grinding solutions, such as Vertimill® 4500 units for a DR-grade iron ore project, signalling a strategy to cover both ends of the comminution flowsheet for steel and bulk commodity clients.

    In our database, Metso already features in sustainability-tagged pieces through energy-efficient grinding and AI-enabled maintenance, so a dry VRM solution marketed in Australia is likely to appeal to miners facing both high power costs and tightening water-use constraints in that jurisdiction.

    The earlier exclusive partnership announcement between Metso Corporation and Loesche GmbH indicates this Australian Mining product piece is one of the first regional deployments, suggesting Metso is now moving from global framework agreement to market-by-market rollout of the VRM technology.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers
    Mining
    1 day ago

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers

    Buffalo Potash has secured Saskatchewan approval to complete construction and operate its Disley initial production module, a 125,000 t/y soluble-grade potash facility 50 km northwest of Regina using a patented horizontal line-drive brine circulation method through parallel horizontal wells. The C$41.5 million module will test selective underground dissolution of potassium chloride with sodium-chloride-saturated brine and supply local agriculture, drilling-fluid markets and potassium-chloride brine for regional oilfields, ahead of planned 500,000 t/y Disley East and West expansions to about 1.13 Mt/y. The permit, which runs to 30 April and excludes future modules, requires groundwater characterisation, air-quality compliance and financial assurance, while the project proceeds without a feasibility study or declared reserves, elevating technical and economic risk.

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners
    Mining
    1 day ago

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners

    Exiro Minerals, Orion Resource Partners and Canada Growth Fund have acquired an 81.1% stake in Vale’s Thompson nickel operations in northern Manitoba, committing up to US$200 million to sustain and develop the six-decade-old complex. The new vehicle, Exiro Nickel, takes over day-to-day control of two operating underground mines, the adjacent concentrator and exploration ground along the 135 km Thompson Nickel Belt, while Vale Base Metals retains an 18.9% interest. A multi-year offtake agreement keeps Vale buying nickel concentrate from the Thompson mill, providing a defined outlet for future production.

    Mining
    1 day ago

    Moeve–Emerita 100% renewable diesel deal in Spain: decarbonisation notes for mines

    Moeve and Emerita Resources have signed Spain’s first mining-sector agreement to deploy 100% renewable diesel (HVO) at industrial scale, designating Moeve as preferred supplier of this second-generation biofuel. The HVO, derived from waste and residue feedstocks rather than food crops, is claimed to cut lifecycle CO2 emissions by up to 90% compared with conventional diesel. For mine operators, the drop-in fuel compatibility with existing diesel engines offers a near-term route to decarbonise haul trucks and auxiliary fleets without major equipment changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental