Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Volvo Autonomous Solutions Säffle build: key haulage insights for mine engineers

    December 11, 2025|

    Reviewed by Tom Sullivan

    Volvo Autonomous Solutions Säffle build: key haulage insights for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Volvo Autonomous Solutions has begun series assembly of its Volvo FH Autonomous mining trucks at Volvo Buses’ Säffle plant in Sweden, marking the shift from pilot builds to industrial production. The facility, long used for high-volume bus manufacturing, has been retooled to integrate V.A.S. autonomous hardware and software stacks directly into the FH platform on the main line. For mine operators, this signals impending availability of OEM-built autonomous haul trucks with factory-integrated perception, control and redundancy systems rather than retrofit kits.

    Technical Brief

    • Säffle plant’s long bus-manufacturing history provides established QA processes for complex electrical and control systems.
    • Factory build allows routing of sensor cabling, power supplies and compute racks within original FH body envelope.
    • OEM integration enables designed-in redundancy for braking, steering and drive control rather than bolt-on fail-safes.
    • Direct-from-factory autonomy reduces on-site retrofit time, aiding brownfield mines with tight shutdown windows.
    • For other OEMs, this move signals a shift from retrofit autonomy kits to line-built autonomous haul platforms.

    Our Take

    Volvo Autonomous Solutions is one of only a few OEM-focused autonomy stories in our 263 Mining pieces, suggesting the Säffle plant is part of a small but growing cluster of factory-level automation initiatives rather than mine-site retrofits.

    Locating autonomous truck assembly at the existing Säffle plant, historically tied to Volvo Buses, signals a reuse of established heavy-vehicle manufacturing infrastructure, which can shorten industrialisation timelines for autonomous haulage fleets compared with greenfield facilities.

    Across the 553 tag-matched ‘Projects’ and ‘Product’ items, most mining vehicle autonomy coverage centres on on-site trials; bringing build capability in-house at Säffle positions Volvo Autonomous Solutions to offer more standardised, fleet-scale deployments rather than bespoke pilot units.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MAX Power Mining’s new natural hydrogen target: subsurface insights for project teams
    Mining
    about 12 hours ago

    MAX Power Mining’s new natural hydrogen target: subsurface insights for project teams

    MAX Power Mining has defined a new natural hydrogen drilling target at the Bracken prospect on the Saskatchewan–Montana border, complementing its confirmed Lawson discovery on the 475 km-long Genesis Trend. The Bracken well, planned to spud in February pending licensing, sits within the 75 km-wide Grasslands project and was sited using 34.3 line-km of proprietary 2D seismic integrated with legacy seismic to map basement architecture, structural pathways and migration corridors. MAX Power aims to use Bracken as a calibration point to test basin-scale continuity and repeatable, scalable natural hydrogen systems that may also host helium.

    Glencore’s Horne smelter talks: emissions, capex and closure risk for mine planners
    Mining
    about 14 hours ago

    Glencore’s Horne smelter talks: emissions, capex and closure risk for mine planners

    Glencore remains deadlocked with Quebec over the future of its nearly 100-year-old Horne copper smelter in Rouyn-Noranda, where arsenic emissions must be cut from current levels to 45 ng/m³ by March and 15 ng/m³ from 2027—still five times the provincial standard. The company is weighing a US$200 million modernisation to meet the 15 ng/m³ target but is demanding an 18‑month transition period and guarantees against tighter future limits before committing. Closure would also threaten the Canadian Copper Refinery in Montreal, which relies on Horne’s 210,000 t/y copper and precious metals output, and comes amid an authorised class action over historical emissions.

    Mining
    about 16 hours ago

    Liberia–ArcelorMittal long-term MDA: rail corridor implications for mine planners

    The Government of Liberia and ArcelorMittal have signed an amended Mineral Development Agreement extending the company’s iron ore mining rights to 2050, with an option to renew for a further 25 years. The ratified deal secures long-term access to Liberia’s existing rail and port export corridor, critical for moving high-volume ore from inland operations to the Port of Buchanan. For mine planners and infrastructure engineers, the extended tenure supports justification of major brownfield upgrades to rail capacity, load-out facilities and materials handling systems over multi-decade horizons.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.