Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Victory’s hafnium at North Stanmore: flowsheet and revenue notes for engineers

    February 9, 2026|

    Reviewed by Tom Sullivan

    Victory’s hafnium at North Stanmore: flowsheet and revenue notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has reported metallurgical test work at its North Stanmore rare earths project near Cue in Western Australia confirming a high-value hafnium by-product alongside its clay-hosted REE mineralisation. The company is advancing flowsheet development to selectively recover hafnium from leach solutions already designed for rare earth extraction, positioning the metal as a potential “game-changer” revenue stream. For process and project engineers, the key issue will be integrating hafnium separation into existing hydrometallurgical circuits without materially increasing reagent consumption or capital intensity.

    Technical Brief

    • Hafnium reports in the same leach liquor as rare earths from North Stanmore clay-hosted mineralisation.
    • Metallurgical work indicates hafnium is selectively recoverable without materially altering existing leach conditions.
    • Test work is being completed on bulk composite samples representative of current resource domains.
    • Victory is assessing additional solvent extraction stages to split hafnium from zirconium and other high-field-strength elements.
    • Integration studies focus on maintaining rare earth recovery while adding a hafnium bleed stream from loaded solutions.
    • Project economics are being remodelled to include a hafnium by-product credit alongside rare earth revenue.
    • Flowsheet options under review include separate hafnium precipitation versus co-precipitation followed by downstream refining.
    • Outcome will influence sizing of hydrometallurgical plant equipment, particularly mixer-settlers and impurity removal circuits.

    Our Take

    Hafnium appears in only a handful of keyword-matched pieces in our database, signalling that Victory Metals is moving into a niche, high-specification metals space rather than the bulk commodities that dominate Western Australian project coverage.

    For a Western Australia project like North Stanmore, positioning around hafnium could open doors to defence, aerospace and advanced electronics supply chains, which typically involve longer qualification cycles but can support premium pricing and offtake stability.

    Within our 955 Mining stories, most Australian project items centre on iron ore, gold and battery metals, so a hafnium-focused development may face fewer direct domestic competitors but also a thinner local service and processing ecosystem to draw on.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Boss Energy sticks to Honeymoon guidance: wet-season lessons for ISR engineers
    Mining
    about 4 hours ago

    Boss Energy sticks to Honeymoon guidance: wet-season lessons for ISR engineers

    Boss Energy will keep its 2025–26 production guidance for the Honeymoon in-situ recovery uranium project in South Australia despite a rain-hit quarter that reduced output. Heavy rainfall disrupted wellfield access and slowed resin loading from the ion-exchange columns, temporarily constraining plant throughput. Management is banking on improved dry-season access and additional production wells coming online to recover volumes, signalling confidence in the leach circuit and groundwater management strategy rather than revising guidance after a single weather-affected quarter.

    Sandvik Ranger DX1010i drill rig: design and productivity notes for mine planners
    Mining
    about 5 hours ago

    Sandvik Ranger DX1010i drill rig: design and productivity notes for mine planners

    Sandvik is set to launch the Ranger DX1010i top hammer surface drill rig at CONEXPO‑CON/AGG 2026, targeting high‑productivity mining and quarry bench drilling. The DX1010i builds on the Ranger DXi platform with 290°–360° revolving superstructure coverage and an integrated Sandvik rock drill, enabling fewer set‑ups and faster drilling cycles on 76–127mm holes. For mine planners and drill‑and‑blast engineers, the extended reach and automated drilling controls are aimed at tighter pattern accuracy and reduced non‑drilling time on large benches.

    Kalamazoo’s new CEO: development and de-risking lens on 1.44Moz gold projects
    Mining
    about 5 hours ago

    Kalamazoo’s new CEO: development and de-risking lens on 1.44Moz gold projects

    Kalamazoo Resources has appointed seasoned mining executive Andrew McDougall as chief executive officer to drive development of its 1.44-million-ounce gold portfolio in Western Australia and Victoria. McDougall, who previously held senior roles with mid-tier producers and project developers, is expected to focus on advancing the Castlemaine and Ashburton projects through resource growth and study de-risking. The leadership change signals a push from exploration-led value to near-term development, with implications for drilling contractors, study consultants and potential JV or farm-in partners.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.