Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Safety

    Boss Energy sticks to Honeymoon guidance: wet-season lessons for ISR engineers

    March 5, 2026|

    Reviewed by Tom Sullivan

    Boss Energy sticks to Honeymoon guidance: wet-season lessons for ISR engineers

    First reported on Australian Mining

    30 Second Briefing

    Boss Energy will keep its 2025–26 production guidance for the Honeymoon in-situ recovery uranium project in South Australia despite a rain-hit quarter that reduced output. Heavy rainfall disrupted wellfield access and slowed resin loading from the ion-exchange columns, temporarily constraining plant throughput. Management is banking on improved dry-season access and additional production wells coming online to recover volumes, signalling confidence in the leach circuit and groundwater management strategy rather than revising guidance after a single weather-affected quarter.

    Technical Brief

    • Elevated groundwater inflows likely demanded closer monitoring of hydraulic gradients to maintain leach containment and avoid excursions.
    • Resin loading slowdowns in ion-exchange columns suggest reduced flow or altered chemistry, requiring tighter process control checks.
    • Wet-season contingency planning now hinges on all-weather access tracks, drainage upgrades and more robust traffic management.
    • Safety procedures for working around flooded sumps, ponds and process areas would need reinforcement and additional PPE controls.

    Our Take

    Boss Energy’s Honeymoon uranium project sits within a relatively small subset of our 1112 Mining stories that combine uranium with Safety and Projects tags, signalling that operational reliability and risk management are under closer scrutiny for Australian uranium developers than for many base-metal projects.

    Maintaining guidance into the 2025/26 financial year despite weather disruption suggests Boss is targeting a ramp-up profile resilient to climate-related interruptions, an issue that has affected several Australian open-pit and ISR operations in our database over the past few wet seasons.

    Among uranium-tagged pieces in our coverage, Australian projects like Honeymoon tend to progress without the geopolitical and permitting headwinds seen in some African and North American uranium stories, which can give operators here a relative advantage in locking in medium-term supply commitments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sandvik Ranger DX1010i drill rig: design and productivity notes for mine planners
    Mining
    about 4 hours ago

    Sandvik Ranger DX1010i drill rig: design and productivity notes for mine planners

    Sandvik is set to launch the Ranger DX1010i top hammer surface drill rig at CONEXPO‑CON/AGG 2026, targeting high‑productivity mining and quarry bench drilling. The DX1010i builds on the Ranger DXi platform with 290°–360° revolving superstructure coverage and an integrated Sandvik rock drill, enabling fewer set‑ups and faster drilling cycles on 76–127mm holes. For mine planners and drill‑and‑blast engineers, the extended reach and automated drilling controls are aimed at tighter pattern accuracy and reduced non‑drilling time on large benches.

    Kalamazoo’s new CEO: development and de-risking lens on 1.44Moz gold projects
    Mining
    about 5 hours ago

    Kalamazoo’s new CEO: development and de-risking lens on 1.44Moz gold projects

    Kalamazoo Resources has appointed seasoned mining executive Andrew McDougall as chief executive officer to drive development of its 1.44-million-ounce gold portfolio in Western Australia and Victoria. McDougall, who previously held senior roles with mid-tier producers and project developers, is expected to focus on advancing the Castlemaine and Ashburton projects through resource growth and study de-risking. The leadership change signals a push from exploration-led value to near-term development, with implications for drilling contractors, study consultants and potential JV or farm-in partners.

    Dimetix silo level measurement: integration and reliability notes for mine engineers
    Mining
    about 5 hours ago

    Dimetix silo level measurement: integration and reliability notes for mine engineers

    Silo level measurement using Dimetix D‑Series laser distance sensors is being promoted for bulk materials handling in sectors such as mining, plastics and construction materials, offering non-contact measurement over long ranges with millimetre accuracy. The IP65/67-rated units can be mounted at the silo roof, measure through dust using visible red laser technology, and integrate via standard industrial interfaces (e.g. 4–20 mA, Profibus, Profinet) into existing PLC/SCADA systems. For mine sites, this enables continuous stock level monitoring in ore, cement or lime silos without intrusive radar probes or load cells, reducing maintenance in abrasive, dusty environments.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.