Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Supra Elemental Recovery: what its US gallium and scandium push means for miners

    February 4, 2026|

    Reviewed by Joe Ashwell

    Supra Elemental Recovery: what its US gallium and scandium push means for miners

    First reported on MINING.com

    30 Second Briefing

    University of Texas at Austin spinout Supra Elemental Recovery has raised an oversubscribed $2 million pre-seed round, led by Crucible Capital, to commercialise a proprietary refining platform for high-purity gallium, scandium and other critical minerals from US industrial byproducts, mine tailings and e-waste. The non-toxic process combines solvent extraction and ion exchange, claiming up to 100× greater selectivity and speed than conventional methods, with initial focus on semiconductor supply chains and validation for cobalt and lithium. Commercial pilots are targeted for 2026, directly addressing the US’s 100% import dependence on gallium and scandium.

    Technical Brief

    • Supra’s refining platform merges solvent extraction and ion exchange in a single non‑toxic flowsheet.
    • Process design targets high‑purity separation of gallium and scandium from mixed, low‑grade waste feeds.
    • Feedstocks explicitly include industrial byproducts, mine tailings and electronic waste generated within the United States.
    • Multi‑element recovery from multiple waste sources is positioned as a hedge against single‑asset or single‑ore dependency.
    • Technology is derived from federally funded materials science and engineering research at the University of Texas at Austin.
    • For US miners, tailings and process residues become potential critical‑mineral revenue streams without new primary extraction.

    Our Take

    With the US 100% import-dependent on gallium and scandium, the planned $12 billion “Project Vault” stockpile (2 Feb 2026 item) suggests early domestic producers like Supra Elemental Recovery could secure premium, policy-driven offtake rather than purely market-priced sales.

    Other US critical-mineral plays in our database, such as Ionic Mineral Technologies’ Silicon Ridge project in Utah (14 Dec 2025), are targeting primary extraction, whereas Supra’s process focus positions it to bolt onto existing lithium, cobalt, gold or silver operations as a by-product recovery upgrade.

    The $2 million pre-seed round is modest compared with multi-billion-dollar federal allocations in the “One Big Beautiful Bill” (8 Dec 2025), which likely means Supra will need to demonstrate its claimed 100× selectivity/speed gains quickly to tap into larger DOE or EXIM-backed funding streams by its 2026 pilot horizon.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners
    Mining
    about 3 hours ago

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners

    Hertha Metals has broken ground on its $100 million Hertha Chalyx plant in Conroe, Texas, designed to produce about 10,000 tonnes per year of combined steel-grade and magnet-grade high-purity iron using domestic ore from Minnesota’s Iron Range and Texas natural gas. The facility, adjacent to the Pi100 pilot plant where 99.95% purity was achieved in August, will scale Hertha’s FLEXHERS process, which couples electric arc furnace technology with natural gas or hydrogen. First magnet-grade output is targeted for early 2028, feeding US NdFeB magnet makers that currently rely on China for an estimated 94% of high-purity iron.

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners
    Mining
    about 3 hours ago

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    PC Gold has identified a new high-grade North Link zone immediately north of the existing mineral resource estimate at its Spring Hill gold project in the Northern Territory, based on recent reverse-circulation drilling targeting mineralisation extensions. The North Link structure is interpreted to connect with known lodes within the current MRE footprint, potentially extending strike continuity and adding shallow, open-pittable ounces. For mine planners and geotechs, the result signals a need to revisit pit shell optimisation, geotechnical domains and slope design north of the present resource limits.

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners
    Mining
    about 3 hours ago

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners

    Horizon Gold has reported its strongest intercept yet at the Snook prospect within the Gum Creek project in Western Australia, with reverse-circulation drilling returning 44m at 5.08g/t gold from 145m, including 11m at 16.30g/t from 174m. The thick, high-grade zone at moderate depth points to a larger open pit shell and supports evaluation of underground mining scenarios beneath any eventual pit floor. For mine planners and geotechs, the result justifies updated pit optimisations, geotechnical domain modelling and closer-spaced drilling to refine continuity and rock mass conditions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental