Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Sandvik–ThoroughTec Simulation deal: data-driven training takeaways for mine teams

    February 13, 2026|

    Reviewed by Joe Ashwell

    Sandvik–ThoroughTec Simulation deal: data-driven training takeaways for mine teams

    First reported on MINING.com

    30 Second Briefing

    Sandvik is acquiring South African-based ThoroughTec Simulation, an OEM-agnostic mining training simulator specialist with about 200 staff and 2025 revenues of roughly SEK 170 million, to be folded into Sandvik Mining and Rock Solutions’ parts and services division. ThoroughTec’s simulators and training management system will be combined with Sandvik’s digital solutions to deliver data-driven, customised operator training based on real machine performance, targeting higher productivity, improved operator behaviour and lower maintenance costs. The deal, with an undisclosed price, is expected to close in Q2 2026 and be EBITA-margin accretive.

    Technical Brief

    • ThoroughTec’s simulators are OEM‑agnostic, already deployed on fleets including CAT 740B articulated dump trucks.
    • ThoroughTec is headquartered in Durban, South Africa, with a broad-based global sales and support footprint.
    • Workforce exceeds 200 employees, implying a reasonably large in‑house software, hardware and support capability.
    • 2025 revenues of ~SEK 170 million indicate a mid‑scale, commercially proven training technology provider.
    • Transaction closing is targeted for Q2 2026, subject to standard regulatory approvals in relevant jurisdictions.
    • Sandvik reports ThoroughTec currently operates with a “strong” EBITA margin, supporting accretive aftermarket economics.
    • For mine operators, pairing simulator telemetry with real machine data could enable site‑specific operator KPIs and maintenance triggers.

    Our Take

    In our database, Sandvik features heavily in equipment and tooling launches (such as the recent RG550Be drill bit resharpening machine and Tampere plant expansion), so acquiring ThoroughTec Simulation in South Africa signals a push to wrap higher-margin digital training and lifecycle services around its growing hardware fleet.

    ThoroughTec’s OEM‑agnostic simulators, now under Sandvik, are likely to be used to deepen account penetration at large underground contracts like the SEK417 million Cowal order, where integrated training and operator upskilling can be bundled into equipment deals without being tied to a single mine or commodity such as copper or gold.

    With ThoroughTec’s more than 200 employees and cloud-based training platform anchored in Durban, Sandvik gains a regional tech hub in Africa, which could shorten deployment and support cycles for mines across the continent compared with relying solely on European service centres.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Pension funds use gold as bond hedge weakens: allocation signals for mine planners
    Mining
    1 day ago

    Pension funds use gold as bond hedge weakens: allocation signals for mine planners

    Pension funds in the Netherlands, US, Britain and Australia are keeping 2%–5% of portfolios in gold, typically via physical bullion or futures, as bond–equity correlations rise and government bonds lose diversification power, according to the World Gold Council. Dutch fund PDN (€7.7 billion) reallocated 10% of its government bonds in 2020–21 to reach a 5% gold stake, while Fairfax County Retirement Systems (US$6.2 billion) holds about 3% in gold futures and Now: Pensions Master Trust (UK, £8+ billion) around 2%. NGS Super in Australia maintains roughly 3% in gold alongside sovereign bonds as a defensive, inflation- and currency-risk hedge, with all four funds retaining positions opened during the pandemic.

    Rare earth elements hiding in plain sight: discovery and processing risks for miners
    Mining
    1 day ago

    Rare earth elements hiding in plain sight: discovery and processing risks for miners

    Global rare earth element supply remains constrained not by crustal scarcity but by discoverability, complex mineralogy and marginal economics, with lanthanides like cerium more abundant than copper yet commercially viable ores largely limited to bastnäsite, monazite and xenotime. Exploration relies on proxy signatures rather than direct REE detection, combining magnetics, gravity, radiometrics, IP, MT, seismic reflection, ERT/EM and hyperspectral imaging (from EnMAP/PRISMA satellites to core scanning) to target carbonatites, alkaline intrusions, unconformity systems and ion-adsorption clays. Metallurgical risk is high: refractory hosts (eudialyte, zircon), radioactivity from thorium/uranium, and the need to confirm genuinely ionic IACDs via costly lab tests leave many anomalies uneconomic, reinforcing China’s dominance, particularly in heavy REEs from southern China and Myanmar.

    Grasberg copper mill at 67%: recovery, cave ramp‑up and risk notes for mine engineers
    Mining
    1 day ago

    Grasberg copper mill at 67%: recovery, cave ramp‑up and risk notes for mine engineers

    Freeport-McMoRan’s Grasberg copper-gold complex in Central Papua has restored milling to about 140,000 tonnes of ore per day, roughly 67% of normal rates, a year after an 800,000-tonne mudslide from the former open pit killed seven workers and forced a shutdown. The Grasberg Block Cave supplied about 70,000 tonnes per day of mill feed in Q3, with underground material-handling upgrades due by early 2027 and Production Block 1S targeted to restart by mid-2027, lifting output towards 80% of capacity. PT Freeport Indonesia’s East Java smelter is ramping up alongside the PT Smelting facility, together able to produce up to 800,000 tonnes of copper cathode annually, while Freeport guides to Q3 copper production of 830 million lb and expects realised prices above $6.50/lb.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental