Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Aramine AutoNav Tele loader at Reward Gold mine: design and safety notes for planners

    February 24, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    RCT – Powered by Epiroc’s AutoNav Tele automation has been fitted to an Aramine L350D loader to support narrow vein stoping at Vertex Minerals’ Reward Gold mine at Hill End, after the unit was commissioned through Epiroc’s Orange Service Centre in New South Wales. The compact L350D, designed for ultra-narrow headings, is now operated via tele-remote AutoNav control rather than line-of-sight, allowing tramming and loading in constrained drives. For geotechnical and mine planners, this enables extraction in thinner ore lenses while keeping operators out of unsupported ground.

    Technical Brief

    • Remote operation removes the operator from the loader cab entirely, reducing exposure to rockfall and dust.
    • Tele-remote capability allows tramming through tight cross-sections where installing conventional refuge or bolter coverage is difficult.
    • Automation logic manages tramming and bucket cycles, standardising operator behaviour and reducing collision risk in constrained drives.
    • For similar narrow-vein mines, such tele-remote retrofits offer a pathway to reduce manned time in unsupported headings.

    Our Take

    Epiroc’s recurring appearance in our recent coverage—from exploration growth in 2025 to new safety modules at PDAC 2026—signals that the Reward Gold mine deployment is part of a wider push to bundle automation and safety features across its underground portfolio rather than isolated product sales.

    RCT’s work at the Reward Gold mine follows its Remote Shutdown System rollout at Glencore’s McArthur River Mine in Australia, suggesting the company is building a strong domestic reference base for safety-focused control systems that could appeal to other Australian gold operators at sites like Hill End.

    Within our 352 gold‑tagged pieces, relatively few focus on mid-tier Australian sites such as Hill End, so the Aramine L350D automation retrofit at Reward Gold mine stands out as an example of advanced tele-remote capability being applied beyond the country’s flagship gold hubs in WA and Queensland.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    EGA–Century Aluminium US smelter JV: capacity, schedule and risks for engineers
    Mining
    about 1 hour ago

    EGA–Century Aluminium US smelter JV: capacity, schedule and risks for engineers

    Emirates Global Aluminium and Century Aluminum will build Oklahoma Primary Aluminum, a 750,000‑tonne‑per‑year smelter at Inola that will more than double current US primary aluminium output and be the first new US smelter since 1980. EGA will hold 60% of the joint venture and Century 40%, with construction targeted to start by end‑2026 and first metal by around 2030, creating 4,000 construction and 1,000 permanent jobs. US Aluminum is separately evaluating a co‑located fabrication plant to convert liquid metal into products for electrical, defence, aerospace, automotive and machinery applications.

    Alkane’s Kendal antimony-gold hits: mine planning and geotechnical notes
    Mining
    about 2 hours ago

    Alkane’s Kendal antimony-gold hits: mine planning and geotechnical notes

    Alkane Resources has reported multiple high‑grade antimony–gold intercepts at the Kendal prospect, adjacent to the Youle lode at its Costerfield operation in central Victoria, signalling a potentially significant extension of the narrow-vein system. The discovery targets antimony, a critical mineral used in advanced military and defence applications, alongside high-value gold grades typical of Costerfield-style mineralisation. For mine planners and geotechs, the proximity to existing Youle infrastructure suggests scope for incremental underground development and resource expansion rather than a greenfield build.

    WA Mining 2026: programme focus and planning notes for mine engineers
    Mining
    about 2 hours ago

    WA Mining 2026: programme focus and planning notes for mine engineers

    Tickets are now on sale for the 2026 WA Mining Conference & Exhibition in Perth, following a record 2025 event that drew strong attendance from mine operators, OEMs and METS suppliers across Western Australia’s iron ore, gold and battery minerals sectors. The 2026 program is expected to again focus on automation, decarbonisation and electrification of haulage and processing fleets, alongside data-driven mine planning and remote operations. For engineers, the event offers concentrated access to equipment demonstrations, brownfield upgrade case studies and regulatory updates relevant to WA’s large-scale open-pit and underground operations.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy