Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Failure
    Safety

    Centerra Langeloth explosion: process safety and moly supply notes for engineers

    January 30, 2026|

    Reviewed by Tom Sullivan

    Centerra Langeloth explosion: process safety and moly supply notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Centerra Gold has suspended operations at its Langeloth metallurgical facility in Pennsylvania after an uncontrolled mixture of chemicals triggered an uncontained reaction adjacent to the acid plant at about 6:15 p.m. Eastern on Thursday. Two contractors were hospitalised with injuries and two employees taken to hospital as a precaution, with Centerra reporting no significant environmental release and confirming regulators have been notified. The shutdown hits Centerra’s key downstream plant for molybdenum concentrate, slated to process output from the Thompson Creek mine in Idaho when it restarts next year.

    Technical Brief

    • Incident reinforces the need for rigorous process safety management around acid plants, including HAZOP refresh and contractor-permit controls.

    Our Take

    Centerra Gold already features heavily in our recent Canada-focused coverage through the Kemess and Mount Milligan copper-gold assets in British Columbia, so a safety incident at the Langeloth metallurgical facility in Pennsylvania adds cross-border operational risk considerations for lenders and insurers looking at the group’s North American portfolio.

    Because Langeloth processes molybdenum and Centerra has recently taken a 9.9% equity stake in molybdenum-exposed junior Metal Energy, any prolonged disruption at the facility could complicate how investors value Centerra’s broader moly strategy rather than just its gold-copper mine pipeline.

    The 8% share-price reaction on a C$4.8 billion market value underscores how safety and processing-plant reliability are being priced into Centerra’s M&A legacy assets like Thompson Creek Metals, which contrasts with more growth-oriented sentiment seen around its Kemess PEA and Mount Milligan life-extension approvals in British Columbia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 12 hours ago

    Boliden Somincor–EDP–Greenvolt solar UPAC: integration notes for Neves‑Corvo mine engineers

    Boliden Somincor has partnered with EDP and Greenvolt to build Portugal’s largest self‑consumption solar generation unit (UPAC) near the Neves‑Corvo zinc mine at Castro Verde, supplying power directly to mine operations. The distributed solar plant will sit adjacent to one of Europe’s largest zinc orebodies, reducing grid dependence for high‑load processes such as hoisting, ventilation and paste backfill plants. For mine planners and electrical engineers, the project signals growing integration of large‑scale on‑site renewables into base‑metal underground operations in southern Europe.

    Mining
    about 16 hours ago

    Aramine AutoNav Tele loader at Reward Gold mine: design and safety notes for planners

    RCT – Powered by Epiroc’s AutoNav Tele automation has been fitted to an Aramine L350D loader to support narrow vein stoping at Vertex Minerals’ Reward Gold mine at Hill End, after the unit was commissioned through Epiroc’s Orange Service Centre in New South Wales. The compact L350D, designed for ultra-narrow headings, is now operated via tele-remote AutoNav control rather than line-of-sight, allowing tramming and loading in constrained drives. For geotechnical and mine planners, this enables extraction in thinner ore lenses while keeping operators out of unsupported ground.

    Mining
    about 17 hours ago

    Bosch Rexroth–MEDATech off‑highway electrification: integration notes for mine engineers

    Bosch Rexroth is partnering with MEDATech Engineering to deliver end‑to‑end electrification packages for off‑highway and mining mobile equipment, combining Rexroth’s mobile hydraulics, inverters and controls with MEDATech’s EV drivetrain integration capability. The collaboration targets full systems from componentry and software through to application‑specific design and build, aimed at OEMs and retrofit projects for haul trucks, loaders and other heavy units. For mine operators, this points to more standardised electric powertrain architectures and a clearer route to integrating high‑voltage drivetrains with existing hydraulic and control systems.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.