Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Anglo Asian–Worley Xarxar, Garadag studies: capex and layout insights for mine planners

    June 22, 2026|

    Reviewed by Tom Sullivan

    Anglo Asian–Worley Xarxar, Garadag studies: capex and layout insights for mine planners

    First reported on International Mining – News

    30 Second Briefing

    Anglo Asian Mining has appointed Worley Europe Limited to deliver full feasibility studies for its Xarxar and Garadag copper-gold projects in Azerbaijan, moving both assets towards potential development decisions. Worley, part of Australia-headquartered Worley Group, will apply its global open-pit and processing-plant design capability to define mine layouts, metallurgical flowsheets and infrastructure requirements. The work is expected to firm up capital and operating cost estimates and clarify options for staged development and shared infrastructure across the two deposits.

    Technical Brief

    • Anglo Asian’s existing Azerbaijan operating experience should inform local geotechnical, hydrological and permitting assumptions in Worley’s models.
    • Worley’s global copper project portfolio provides relevant benchmarking for capex, opex and process route selection.
    • Study outcomes will be critical for project financing, reserve declaration and conversion from resources to mineable inventory.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners
    Mining
    about 8 hours ago

    Hertha Metals’ $100M Texas iron plant: supply and process notes for mine planners

    Hertha Metals has broken ground on its $100 million Hertha Chalyx plant in Conroe, Texas, designed to produce about 10,000 tonnes per year of combined steel-grade and magnet-grade high-purity iron using domestic ore from Minnesota’s Iron Range and Texas natural gas. The facility, adjacent to the Pi100 pilot plant where 99.95% purity was achieved in August, will scale Hertha’s FLEXHERS process, which couples electric arc furnace technology with natural gas or hydrogen. First magnet-grade output is targeted for early 2028, feeding US NdFeB magnet makers that currently rely on China for an estimated 94% of high-purity iron.

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners
    Mining
    about 8 hours ago

    PC Gold’s new North Link zone at Spring Hill: pit and slope implications for planners

    PC Gold has identified a new high-grade North Link zone immediately north of the existing mineral resource estimate at its Spring Hill gold project in the Northern Territory, based on recent reverse-circulation drilling targeting mineralisation extensions. The North Link structure is interpreted to connect with known lodes within the current MRE footprint, potentially extending strike continuity and adding shallow, open-pittable ounces. For mine planners and geotechs, the result signals a need to revisit pit shell optimisation, geotechnical domains and slope design north of the present resource limits.

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners
    Mining
    about 8 hours ago

    Horizon’s Snook gold hits: pit shell growth and UG options for mine planners

    Horizon Gold has reported its strongest intercept yet at the Snook prospect within the Gum Creek project in Western Australia, with reverse-circulation drilling returning 44m at 5.08g/t gold from 145m, including 11m at 16.30g/t from 174m. The thick, high-grade zone at moderate depth points to a larger open pit shell and supports evaluation of underground mining scenarios beneath any eventual pit floor. For mine planners and geotechs, the result justifies updated pit optimisations, geotechnical domain modelling and closer-spaced drilling to refine continuity and rock mass conditions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental