Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product
    Sustainability

    BHP & Rio Cat BEV truck trials in the Pilbara: haulage and power notes for engineers

    December 5, 2025|

    Reviewed by Joe Ashwell

    BHP & Rio Cat BEV truck trials in the Pilbara: haulage and power notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Australia’s first Cat 793 XE Early Learner battery-electric haul trucks have arrived at BHP’s Jimblebar iron ore mine in the Pilbara, where BHP and Rio Tinto will jointly test Caterpillar’s BEV heavy haulage platform under production conditions. The two 220‑t class trucks, supplied under an industry‑first shared development agreement, will be evaluated on typical Pilbara duty cycles, ramp profiles and ambient temperatures. Data from Jimblebar will feed into Caterpillar’s commercial 793 BEV design, with direct implications for trolley, charging and pit power infrastructure planning across large open pits.

    Technical Brief

    • Outcomes are expected to influence future diesel displacement roadmaps across large Australian mining truck fleets.

    Our Take

    BHP and Rio Tinto are two of the most frequently appearing majors in our 180 Mining stories, so Pilbara iron ore decarbonisation moves like these BEV truck trials are likely to set informal benchmarks for other bulk operators considering fleet renewal.

    Running Caterpillar’s Early Learner battery-electric trucks at Jimblebar gives BHP and Rio Tinto early operational data they can leverage in future procurement negotiations, especially as BHP is simultaneously pursuing large-scale growth options such as its proposed Anglo American combination in other coverage.

    With iron ore a recurring keyword in our database and Pilbara assets central to both BHP and Rio Tinto, proving BEV haulage at this scale will be closely watched by regulators and investors as a test case for how quickly high-tonnage Australian operations can cut diesel exposure without compromising productivity.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers
    Mining
    2 days ago

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers

    MetalQuest Mining’s Lac Otelnuk project in northern Quebec hosts 4.9 billion tonnes of proven and probable reserves grading 28.7% Fe, with a 2015 feasibility study outlining an 11.6 km by 2.8 km open pit, post-tax NPV of US$5.24 billion (8% discount), IRR of 13% and capital costs of about US$14.2 billion. The study forecasts 68.5% Fe concentrate with 0.02% P and 2.95% SiO₂, positioning it for DRI-based low-emission steelmaking using Quebec hydro power. Infrastructure remains the critical constraint, with a previously proposed 755 km concentrate slurry pipeline to Sept-Îles now likely to be replaced by road and rail, and MetalQuest seeking a major partner ahead of a new feasibility targeted for 2030.

    Mining
    3 days ago

    XCMG–Codelco MoU: haul fleet competition and design notes for Andean copper mines

    XCMG has signed a memorandum of understanding with Chilean copper major Codelco in Santiago on 3 March, following Codelco Chairman Máximo Pacheco’s visit to XCMG’s Xuzhou manufacturing base in February. The agreement, signed by XCMG Vice President Liu Jiansen and Codelco Chief Procurement Officer Mauricio Acuña, centres on expanding supply of large-scale mining equipment and support services to Codelco’s open-pit and underground copper operations. For engineers, the deal signals intensifying competition with established OEMs on haul trucks, loaders and drilling fleets in high-altitude Andean conditions.

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers
    Mining
    3 days ago

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers

    Oklahoma is positioning itself as a critical minerals processing hub rather than a mining state, anchored by Emirates Global Aluminium’s proposed US$4 billion primary aluminium smelter at the Port of Inola on the McClellan–Kerr Arkansas River system and backed by surplus low‑cost power from wind and natural gas. USA Rare Earth is building a vertically integrated rare earth magnet plant in Stillwater with about US$1.6 billion in public and private funding, while Stardust Power (NASDAQ: SDST) is advancing a lithium refinery in Muskogee with Sumitomo offtake and key permits secured. The cluster targets defence and aerospace demand around Tinker Air Force Base and other installations, aiming to plug the “missing middle” between raw mineral supply and finished components.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.