Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product
    Sustainability
    Safety

    BEML 35 t all‑electric mining truck: design and haulage notes for planners

    April 12, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    BEML Ltd has unveiled the BH35-2 EV, India’s first indigenous all‑electric 35 t payload mining dump truck, at its Mysuru complex, signalling a domestic move away from diesel in the small–medium haul segment. The battery-electric platform targets opencast mines currently using 35 t mechanical trucks, cutting local emissions at loading and dumping points and reducing fuel logistics. For mine planners and maintenance teams, the shift implies new charging infrastructure, high‑voltage safety procedures, and revised haul profile optimisation to manage range and cycle times.

    Technical Brief

    • Truck was unveiled and flagged off at BEML’s Mysuru Complex, indicating domestic assembly capability.

    Our Take

    A 35 t payload places the BH35-2 EV in the small-to-mid mine and quarry segment, which in practice is where many operators in India can trial electrification without the infrastructure step-change required for 100–300 t class fleets.

    Compared with Boliden’s ‘green fleet’ deployments in Europe, which focus on copper, nickel and zinc operations, BEML’s move suggests Indian OEMs are positioning to serve a broader base of local iron ore, coal and construction-materials mines that may face tightening air-quality and carbon constraints in the next project cycle.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    BC’s two biggest gold projects: permitting pause and tunnel risks for mine planners
    Mining
    about 11 hours ago

    BC’s two biggest gold projects: permitting pause and tunnel risks for mine planners

    British Columbia has paused permitting for Seabridge Gold’s C$6.4 billion KSM twin tunnels, which would move ore from the Mitchell Valley pits to Treaty Valley processing facilities, until a court dispute with neighbouring Tudor Gold over Treaty Creek claims is resolved. The conflict centres on whether Seabridge’s 2012 conditional mineral reserve grants tunnel rights across Tudor’s Goldstorm and Perfectstorm areas, where Tudor is advancing a 10,000‑tonne‑per‑day underground PEA on a 24.9‑million‑oz indicated gold resource. KSM still holds a 2.3‑billion‑tonne reserve grading 0.64 g/t gold and 0.14% copper, with a planned 33‑year life and 1.03‑million‑oz/y gold output.

    Mining
    2 days ago

    Mammoet at BHP Jansen headframe expansion: modular lift lessons for mine designers

    Mammoet has supported Ledcor in expanding the production and service headframes at BHP’s Jansen potash project in Saskatchewan, a greenfield mine targeting about 8.5 Mt/y of output from 2027 and expected to be among the world’s largest potash operations. The heavy-lift scope centred on installing large preassembled headframe modules and associated steelwork, reducing work at height and minimising crane reconfiguration on the constrained shaft collar area. For mine designers and contractors, the project shows how modular headframe construction and engineered lifting can compress schedules on deep-shaft developments in cold-climate greenfield sites.

    Latin America’s top miners: export rankings and 2026 risk signals for project teams
    Mining
    2 days ago

    Latin America’s top miners: export rankings and 2026 risk signals for project teams

    Latin America’s latest mining rankings contrast countries where mining dominates exports with those where absolute export value rules, putting copper-heavy Chile and Peru alongside smaller, more mining-dependent economies such as Bolivia. The infographic orders states first by mining’s share of total exports and then by the dollar value of those exports, clarifying where copper, iron ore, lithium, rare earths and specialty minerals most shape trade. With 2026 framed as a critical year in a global contest over critical mineral supply chains, the series tracks how shifting geopolitical alliances may affect project risk and offtake security.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.