    Assessing dam failure risk with WTW: probabilistic insights for dam engineers

    February 26, 2026|

    Reviewed by Tom Sullivan

    Assessing dam failure risk with WTW: probabilistic insights for dam engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Assessing dam failure risk with WTW takes centre stage in the latest Engineers Collective podcast, focusing on how insurers and engineers jointly quantify breach probabilities and downstream consequences for large embankment and concrete gravity dams. Discussion covers use of probabilistic risk assessment, portfolio-level screening tools and event trees to evaluate failure modes such as overtopping, internal erosion and spillway degradation under extreme rainfall. The episode also examines how updated risk metrics influence capital maintenance planning, emergency drawdown provisions and prioritisation of dam safety upgrades.

    Technical Brief

    • Failure investigation emphasis is on internal erosion mechanisms, including concentrated leaks and backward erosion piping.
    • WTW discuss combining historical incident databases with dam-specific condition assessments to refine mode likelihoods.
    • Portfolio screening tools are described as triage, flagging structures needing detailed finite element or CFD analysis.
    • Forensic back-analysis of past overtopping and spillway incidents is used to calibrate breach development assumptions.
    • Monitoring focus includes piezometers, leakage flow meters and deformation surveys to detect early internal erosion signatures.
    • Remediation options covered range from filter/drain retrofits and crest-raising to auxiliary spillways and fuse plugs.
    • Insurance-led reviews reportedly push owners to formalise dam safety management systems and periodic independent risk audits.
    • Discussion suggests regulators may increasingly expect probabilistic risk outputs to inform emergency planning and public communication.

    Our Take

    Within the 37 Hazards stories in our coverage, very few focus on third‑party risk advisers like WTW, signalling that insurers and brokers are only just starting to feature as active players in dam failure risk governance rather than sitting purely in the background on policy wording.

    The combination of Failure, Safety and Projects tags aligns this piece with a subset of hazards coverage that typically deals with design-stage risk quantification, suggesting WTW’s methods may be most relevant for owners and EPCs trying to evidence ALARP and defensible risk registers to lenders and regulators.

    Given that many of the 1,640 keyword‑matched pieces involve AI or artificial intelligence, WTW’s dam failure risk work is likely to be read alongside emerging AI‑enabled risk tools, which could push operators to reconcile traditional actuarial approaches with data‑driven, near‑real‑time monitoring of dam performance.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    W G Carter fall death: work-at-height failings and lessons for site engineers
    Hazards
    1 day ago

    W G Carter fall death: work-at-height failings and lessons for site engineers

    W G Carter Limited has been fined £120,000 plus £5,247 costs at Bristol Magistrates Court after 59-year-old worker Richard “Felix” Roper died falling from a stripped first floor onto a concrete ground slab at a barn house in Nether Westcote. A joint HSE and Gloucestershire Police investigation found work at height was not properly planned or supervised, with workers allowed onto joists where floorboards and structural supports had been removed while others continued lifting boards. After a Prohibition Notice, the firm switched to installing replacement joists from below using work-at-height equipment and blocking access to the first floor.

    Met passes Grenfell files to CPS: legal and design lessons for fire engineers
    Hazards
    5 days ago

    Met passes Grenfell files to CPS: legal and design lessons for fire engineers

    Metropolitan Police have submitted 20 investigation files on the Grenfell Tower fire to the Crown Prosecution Service, covering 20 companies and organisations and 54 individuals. Potential charges span corporate manslaughter, gross negligence manslaughter, health and safety offences, fraud and fraud-related offences, and misconduct in public office, following work by a 220-strong investigation team. The CPS aims to issue charging decisions by June 2027, the fire’s tenth anniversary, a timetable relevant for dutyholders involved in high-rise cladding, fire safety design and regulatory compliance.

    GAD–ORR climate hazard analysis: resilience and asset risk insights for engineers
    Hazards
    7 days ago

    GAD–ORR climate hazard analysis: resilience and asset risk insights for engineers

    Government Actuary’s Department actuaries have delivered probabilistic analysis to the Office of Rail and Road on how climate-related hazards such as extreme rainfall, heat and flooding are evolving across UK rail and strategic road assets. Using long‑term climate projections and hazard frequency–severity modelling, the work maps where risks to embankments, cuttings, track buckling and drainage exceedances are likely to increase. The outputs will feed into ORR’s scrutiny of Network Rail and National Highways’ asset management, resilience upgrades and future capital planning.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental