Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety
    Product

    Vibratory screening of mined materials: mesh and maintenance lessons for engineers

    December 17, 2025|

    Reviewed by Joe Ashwell

    Vibratory screening of mined materials: mesh and maintenance lessons for engineers

    First reported on Australian Mining

    30 Second Briefing

    Higher efficiency vibratory screening in mines is being driven by optimised mesh selection, correct vibrator sizing, and improved access to screen vibrators as critical wear parts. Martin Engineering’s Susie O. Bartoli stresses matching vibration frequency and amplitude to particle size distribution and moisture content, along with using appropriate wire diameters and aperture geometries to reduce blinding and carryover. Ergonomic maintenance access to vibrator assemblies and tensioning systems is framed as essential to cut downtime and manual handling risks on multi-deck screening stations.

    Technical Brief

    • Screen vibrators are treated as consumable wear parts, requiring scheduled replacement within planned shutdown windows.
    • Ergonomic access platforms around multi-deck screens reduce working-at-height exposure during vibrator and mesh change-outs.
    • Bolt-on vibrator assemblies allow removal with mechanical aids, limiting manual handling of high-mass components.
    • Standardised vibrator models across screening stations simplify spares inventory and reduce change-out time under permit conditions.
    • Clear isolation points and lock-out/tag-out provisions at each vibrator are emphasised for maintenance safety.
    • Guarding around moving screen components is framed as needing tool-only removal and positive reattachment checks.
    • Guidance links screening design decisions directly to compliance with site-specific safe work procedures and risk assessments.

    Our Take

    Within our 353 Mining stories, Australia-based coverage often clusters around haulage and processing plant upgrades, so a focus on vibratory screening suggests operators are now looking for incremental efficiency gains in secondary circuits rather than only in primary crushing or fleet automation.

    Martin Engineering appears mainly in our database in the context of bulk material handling and dust control, so its push into screening efficiency in Australia likely reflects a strategy to bundle safety, spillage control and throughput optimisation as a single value proposition to mine operators.

    Among the 725 tag-matched pieces on Projects, Safety and Product, relatively few deal with screening hardware, which means mines adopting newer mesh and vibration configurations can still gain a competitive edge in uptime and maintenance exposure compared with more widely discussed conveyor or truck safety upgrades.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.