Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award
    Sustainability

    United Utilities AMP8 delivery shift: key programme lessons for civil engineers

    December 19, 2025|

    Reviewed by Joe Ashwell

    United Utilities AMP8 delivery shift: key programme lessons for civil engineers

    First reported on New Civil Engineer

    30 Second Briefing

    United Utilities is preparing for AMP8 (2025-2030) with a capital works programme several times larger than previous five-year cycles, forcing a shift in how it delivers major water and wastewater infrastructure. Directors are signalling earlier contractor involvement, more alliancing-style frameworks and greater use of offsite manufacture to manage programme risk across multiple large treatment upgrades and network resilience schemes. For geotechnical and civil teams, this points to higher volumes of parallel design-and-build work, tighter standardisation of earthworks and structures, and stronger pressure on delivery productivity.

    Technical Brief

    • The new asset management period (AMP8) represents a generational change to the scale of capital works being implemented in the water industry, with some water companies committing to undertake several times the level of investment seen in previous five-year periods.

    Our Take

    AMP8’s 2025–2030 window is longer than the previous 5‑year cycles, which likely pushes United Utilities towards more programmatic frameworks and alliancing models rather than discrete contract awards, affecting how Tier 1s and SMEs position for work.

    Within our 317 Infrastructure stories, water-utility AMP planning appears less frequently than transport or energy, so United Utilities’ AMP8 delivery approach will be a key reference point for how sustainability is embedded in regulated UK infrastructure portfolios.

    The sustainability tag on this AMP8 coverage signals that environmental performance is now treated as a core delivery constraint rather than an add‑on, which typically leads to earlier contractor involvement for carbon, nature-based solutions and whole‑life asset management input.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Kier, Costain and Sizewell C appointments: delivery implications for UK project teams
    Infrastructure
    1 day ago

    Kier, Costain and Sizewell C appointments: delivery implications for UK project teams

    Senior leadership changes in UK infrastructure this month include new appointments at Kier, Costain and the Sizewell C nuclear project, signalling continued boardroom churn despite a seasonal slowdown. Moves at Kier and Costain affect major highways and rail frameworks, where both contractors hold multi‑year NEC contracts with National Highways and Network Rail worth hundreds of millions of pounds. Governance and delivery capability at Sizewell C are also in focus as the project advances enabling works for the twin EPR units and associated marine and civils packages.

    HS2 2025 build progress: continuity and risk notes for project engineers
    Infrastructure
    4 days ago

    HS2 2025 build progress: continuity and risk notes for project engineers

    HS2 Ltd reports steady 2025 build progress, with major earthworks, tunnelling and viaduct construction advancing on Britain’s largest live infrastructure scheme despite a leadership-led operational reset of the programme. Updated delivery plans are being phased in while maintaining work on key civil assets such as long-section bored tunnels and multi-span high-speed rail viaducts, rather than pausing site activity. For contractors and designers, the message is continuity of core geotechnical and structural work under revised governance and sequencing, not a wholesale slowdown.

    Network Rail £160M Christmas works: delivery and risk notes for project teams
    Infrastructure
    10 days ago

    Network Rail £160M Christmas works: delivery and risk notes for project teams

    Network Rail is delivering £160M of works over Christmas and New Year across England, Wales and Scotland, combining large-scale renewals of ageing track, structures and overhead line equipment with installation of modern digital signalling. Possessions will concentrate on key main line bottlenecks and junctions, with multi-day blockades used to replace life-expired assets and reconfigure layouts for higher line speeds and more reliable timetabling. Contractors will need to manage intensive access windows, complex isolations and winter working risks while handing back routes for the post-holiday peak.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.