    Projects
    Safety

    PYBAR raiseboring at BHP Prominent Hill: design and stability notes for engineers

    February 4, 2026|

    Reviewed by Joe Ashwell

    PYBAR raiseboring at BHP Prominent Hill: design and stability notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    PYBAR’s Raise Bore Division has mobilised to BHP’s Prominent Hill copper-gold mine, 650 km northwest of Adelaide, to construct multiple ventilation raises and inclined ore passes linking the Malu orebody to the new Wira Shaft. The raiseboring programme follows an “innovative study” phase and is aimed at improving ore flow geometry and airflow paths into the shaft infrastructure. Geotechnical and mine planning teams will need to integrate new raise locations with existing stopes and development to manage stability, dilution and long-term ground support demands.

    Technical Brief

    • Raiseboring is being deployed specifically for both vertical ventilation raises and inclined ore passes, reducing drill-and-blast exposure.
    • PYBAR’s dedicated Raise Bore Division is mobilised as a specialist contractor, separating high-risk raise work from general development crews.
    • Mechanised reaming and mucking limit personnel entry into newly created raises, improving compliance with remote-working safety principles.
    • Purpose-built raiseboring rigs provide controlled breakthrough to existing workings, reducing overbreak and unplanned interaction with adjacent stopes.
    • Pre-contract “innovative study” work implies structured geotechnical and constructability reviews before committing to raise locations and diameters.
    • Ventilation raises constructed by raiseboring typically deliver smoother walls, lowering rockfall potential and long-term scaling requirements.
    • Similar deep underground mines can use specialist raiseboring contracts to de-risk critical ventilation and ore-pass construction phases.

    Our Take

    PYBAR’s work at Prominent Hill follows its mobilisation to Larvotto’s Hillgrove antimony-gold project in New South Wales, signalling that the contractor is building a track record in complex Australian underground developments that may appeal to majors like BHP.

    BHP’s parallel push into AI-supported operations, highlighted in recent coverage of its machine-learning deployments, suggests that raiseboring and shaft work at the Prominent Hill Wira Shaft could increasingly be planned and monitored within a more data-rich, automation-ready environment.

    With Prominent Hill sitting in a mature Australian mining jurisdiction 650 km from Adelaide, any productivity or safety gains PYBAR demonstrates on the Malu orebody raiseboring could be quickly benchmarked across other BHP underground assets tracked in our 882 Mining stories database.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers
    Mining
    1 day ago

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers

    MetalQuest Mining’s Lac Otelnuk project in northern Quebec hosts 4.9 billion tonnes of proven and probable reserves grading 28.7% Fe, with a 2015 feasibility study outlining an 11.6 km by 2.8 km open pit, post-tax NPV of US$5.24 billion (8% discount), IRR of 13% and capital costs of about US$14.2 billion. The study forecasts 68.5% Fe concentrate with 0.02% P and 2.95% SiO₂, positioning it for DRI-based low-emission steelmaking using Quebec hydro power. Infrastructure remains the critical constraint, with a previously proposed 755 km concentrate slurry pipeline to Sept-Îles now likely to be replaced by road and rail, and MetalQuest seeking a major partner ahead of a new feasibility targeted for 2030.

    Mining
    2 days ago

    XCMG–Codelco MoU: haul fleet competition and design notes for Andean copper mines

    XCMG has signed a memorandum of understanding with Chilean copper major Codelco in Santiago on 3 March, following Codelco Chairman Máximo Pacheco’s visit to XCMG’s Xuzhou manufacturing base in February. The agreement, signed by XCMG Vice President Liu Jiansen and Codelco Chief Procurement Officer Mauricio Acuña, centres on expanding supply of large-scale mining equipment and support services to Codelco’s open-pit and underground copper operations. For engineers, the deal signals intensifying competition with established OEMs on haul trucks, loaders and drilling fleets in high-altitude Andean conditions.

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers
    Mining
    2 days ago

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers

    Oklahoma is positioning itself as a critical minerals processing hub rather than a mining state, anchored by Emirates Global Aluminium’s proposed US$4 billion primary aluminium smelter at the Port of Inola on the McClellan–Kerr Arkansas River system and backed by surplus low‑cost power from wind and natural gas. USA Rare Earth is building a vertically integrated rare earth magnet plant in Stillwater with about US$1.6 billion in public and private funding, while Stardust Power (NASDAQ: SDST) is advancing a lithium refinery in Muskogee with Sumitomo offtake and key permits secured. The cluster targets defence and aerospace demand around Tinker Air Force Base and other installations, aiming to plug the “missing middle” between raw mineral supply and finished components.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.