Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Perkins–Katanga Engineering DRC deal: uptime and support notes for mine fleets

    December 17, 2025|

    Reviewed by Tom Sullivan

    Perkins–Katanga Engineering DRC deal: uptime and support notes for mine fleets

    First reported on International Mining – News

    30 Second Briefing

    Perkins Engines Company Ltd has appointed Lubumbashi-based Katanga Engineering SAS as an authorised Perkins distributor in the Democratic Republic of Congo, effective 1 January 2026. The deal targets support for high-hour diesel engines on mining haul trucks, gensets and auxiliary plant across copper and cobalt operations in Katanga and other provinces, leveraging Katanga Engineering’s existing field service teams and parts logistics. For mine operators, the move should shorten engine overhaul lead times and improve availability of OEM spares and diagnostics within the DRC rather than relying on cross-border support.

    Technical Brief

    • Local distributor status enables in-country warranty handling and OEM escalation without cross-border intermediaries.
    • Alignment with Perkins’ corporate standards implies adoption of Perkins-approved diagnostic tooling and service procedures.
    • Existing engine experience at Katanga Engineering should support high-hour rebuild strategies rather than simple component swaps.
    • Concentration on DRC conditions allows service regimes tailored to high dust, heat and variable fuel quality.
    • Contract framework provides a single point of contact for mine fleets using mixed Perkins engine models.
    • Similar distributor arrangements in other African mining jurisdictions have typically reduced engine downtime and logistics risk.

    Our Take

    Within our 342 Mining stories, the DRC appears far more often in relation to copper and cobalt project risk than to equipment supply, so Perkins Engines Company Ltd formalising a local distributor in Lubumbashi signals OEMs are deepening on-the-ground support rather than serving the Copperbelt purely from neighbouring countries.

    An effective date of 1 January 2026 gives Katanga Engineering SAS a long lead time to align inventory and service capability with major shutdown cycles in the DRC Copperbelt, which typically cluster around year-end and mid-year for large open-pit and plant operators.

    Among the 699 tag-matched pieces on Projects, Product and Contract Awards, most engine and powertrain items are tied to greenfield builds; a dedicated Perkins channel in the DRC suggests more of the upcoming activity there is expected to be brownfield expansions and reliability upgrades rather than entirely new mines.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.