    Pangea Group slope stability article: GNSS monitoring insights for mine engineers

    November 12, 2025|

    Reviewed by Joe Ashwell

    Pangea Group slope stability article: GNSS monitoring insights for mine engineers

    First reported on Australian Centre for Geomechanics – News

    30 Second Briefing

    Intelligent GNSS slope monitoring systems in open cut mines are moving from intermittent logging to permanently powered operation, collecting one position every 10 seconds and using interquartile filtering to deliver millimetric precision beyond standard centimetre-level RTK. Embedded software rejects outliers beyond 1.5–3 × IQR, routinely detecting 1–2 mm movements and generating multi-tiered products such as 5-minute (≈60-epoch) and 24-hour (≈8,640-epoch) averages. Time-series analyses show rolling 24-hour averages can cut detection lag by 40–60% for non-linear deformations, though longer 48-hour and weekly windows risk masking rapid, rainfall- or blast-driven accelerations.

    Technical Brief

    • GNSS units are permanently powered via battery/solar, avoiding sleep-mode duty cycles that thin datasets.
    • Data are logged at 10‑second epochs specifically to capture blast-, rainfall- and weakness-driven transients.
    • Interquartile filtering is applied on-board, rejecting outliers before averaging to generate independent millimetric positions.
    • Continuous GNSS is positioned as a 3D, non-line-of-sight complement to radar and InSAR in obstructed pits.
    • Safety benefit is framed against recent slope failures in Turkey and North America where deformations went undetected.

    Our Take

    For coal operations in Turkey and Australia, the ability to reliably detect 1–2 mm deformation with 10-second epochs is at the sharper end of what our database shows for open-pit slope monitoring, and is more typical of high-end radar or GNSS arrays on large, high-consequence walls.

    The trade-off quantified here—rolling averages improving sensitivity by 20–30% but potentially delaying alerts by up to 24 hours—gives mine geotechs a concrete basis for tiered alarm logic, where shorter fixed windows govern evacuation triggers and longer rolling windows inform medium-term design or dewatering changes.

    Among the 23 tag-matched Research/Safety/Product pieces in our coverage, very few quantify responsiveness gains (40–60%) from signal processing choices, so Pangea Group’s approach could become a reference point for justifying monitoring frequencies and averaging windows in coal mine Slope Stability Management Plans.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.