Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Research
    Safety
    Product

    Pangea Group slope stability article: GNSS monitoring insights for mine engineers

    November 21, 2025|

    Reviewed by Joe Ashwell

    Pangea Group slope stability article: GNSS monitoring insights for mine engineers

    First reported on Australian Centre for Geomechanics – News

    30 Second Briefing

    Intelligent GNSS slope monitoring systems in open cut mines are moving from intermittent logging to permanently powered operation, collecting one position every 10 seconds and using interquartile filtering to deliver millimetric precision beyond standard centimetre-level RTK. Embedded software rejects outliers beyond 1.5–3 × IQR, routinely detecting 1–2 mm movements and generating multi-tiered products such as 5-minute (≈60-epoch) and 24-hour (≈8,640-epoch) averages. Time-series analyses show rolling 24-hour averages can cut detection lag by 40–60% for non-linear deformations, though longer 48-hour and weekly windows risk masking rapid, rainfall- or blast-driven accelerations.

    Technical Brief

    • GNSS units are permanently powered via battery/solar, avoiding sleep-mode duty cycles that thin datasets.
    • Data are logged at 10‑second epochs specifically to capture blast-, rainfall- and weakness-driven transients.
    • Interquartile filtering is applied on-board, rejecting outliers before averaging to generate independent millimetric positions.
    • Continuous GNSS is positioned as a 3D, non-line-of-sight complement to radar and InSAR in obstructed pits.
    • Safety benefit is framed against recent slope failures in Turkey and North America where deformations went undetected.

    Our Take

    For coal operations in Turkey and Australia, the ability to reliably detect 1–2 mm deformation with 10-second epochs is at the sharper end of what our database shows for open-pit slope monitoring, and is more typical of high-end radar or GNSS arrays on large, high-consequence walls.

    The trade-off quantified here—rolling averages improving sensitivity by 20–30% but potentially delaying alerts by up to 24 hours—gives mine geotechs a concrete basis for tiered alarm logic, where shorter fixed windows govern evacuation triggers and longer rolling windows inform medium-term design or dewatering changes.

    Among the 23 tag-matched Research/Safety/Product pieces in our coverage, very few quantify responsiveness gains (40–60%) from signal processing choices, so Pangea Group’s approach could become a reference point for justifying monitoring frequencies and averaging windows in coal mine Slope Stability Management Plans.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Central Nevada Gold’s Mule Canyon acquisition: project and risk lens for engineers
    Mining
    about 18 hours ago

    Central Nevada Gold’s Mule Canyon acquisition: project and risk lens for engineers

    Central Nevada Gold has completed a US$20 million acquisition of Newmont’s past‑producing Mule Canyon mine in Nevada, targeting a prefeasibility study and key permits in H2 2027 ahead of a potential 2028 construction decision. Mule Canyon previously produced about 500,000 oz gold at an average head grade of 3.8 g/t with ~94% metallurgical recovery, and comes with a database of 2,149 drill holes totalling over 335,000 metres across six mineralised zones over 2.5 km. The company plans an IPO as early as 2027 after a 20‑hole metallurgical and infill drilling programme to upgrade inferred resources and de‑risk the project.

    Greenland Mines’ Sarfartoq licence: key project and offtake notes for mine planners
    Mining
    about 18 hours ago

    Greenland Mines’ Sarfartoq licence: key project and offtake notes for mine planners

    Greenland Mines has secured government approval under the Greenland Mineral Activities Act for the indirect transfer of the Sarfartoq carbonatite complex exploration licence, clearing a key condition in its US$35 million acquisition from Neo Performance Materials, which retains offtake rights to up to 60% of future ore or concentrate. The Nd-Pr-enriched project, about 60 km from Kangerlussuaq, carries a historic NI 43-101 resource with 5.88 Mt indicated at 1.77% TREO and 2.46 Mt inferred at 1.59% TREO, based on 23,000 m of drilling. The news sent Greenland Mines’ NASDAQ-listed shares up more than 22%, giving the company a market capitalisation of US$31.4 million.

    Silver price 20% August surge: leverage, scenarios and risks for mine planners
    Mining
    about 18 hours ago

    Silver price 20% August surge: leverage, scenarios and risks for mine planners

    Silver surged about 20% in August to touch $70/oz on 21 August, driven by the US Treasury’s move to double long-bond buybacks, pushing prices above several banks’ 2026 baseline forecasts but still below the most bullish $110–$160/oz year-end and Q4 targets. Equity leverage has been stark: Hecla Mining gained 47%, Wheaton Precious Metals 44%, and Coeur, First Majestic and Fortuna each 42%, while the Global X Silver Miners ETF rose 35% and junior-focused SILJ 32%. Forecasts now span roughly $67–$118/oz for peaks, with tail-risk scenarios from Bank of America and BMO stretching above $135/oz if the gold–silver ratio compresses.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental