Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Osisko–JDS Cariboo gold build: execution and EPCM takeaways for mine engineers

    February 10, 2026|

    Reviewed by Tom Sullivan

    Osisko–JDS Cariboo gold build: execution and EPCM takeaways for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Osisko Development’s Barkerville Gold Mines has signed a definitive project and construction management services agreement with JDS Energy & Mining to build the Cariboo underground gold project in British Columbia. A feasibility study completed in April 2025 outlines a “robust and scalable” underground mine, with JDS to coordinate detailed engineering, procurement and construction management across the processing plant, underground infrastructure and surface facilities. The deal signals progression from study to execution, with geotechnical design, underground access development and shaft/decline construction planning now moving onto a defined EPCM footing.

    Technical Brief

    • Agreement scope covers processing plant, underground mine infrastructure and all associated surface support facilities.
    • JDS role includes coordinating detailed engineering, procurement, construction management and site integration of multiple work packages.
    • Barkerville Gold Mines remains project owner, with JDS acting as project and construction manager rather than EPC.
    • Contract moves Cariboo from feasibility-level design into execution planning, including constructability and sequencing reviews.
    • Underground works under JDS remit expected to include primary access development, materials handling and services distribution.
    • Surface facilities package likely to bundle tailings, waste management, power distribution and camp/laydown infrastructure under one manager.
    • Having a single construction manager across plant and underground reduces interface risk between mine, process and infrastructure teams.

    Our Take

    Among the 313 gold-related pieces in our database, British Columbia projects like Cariboo feature less frequently than Québec or Ontario assets, signalling that this build could become one of the province’s more closely watched gold developments over the next few years.

    With the Cariboo gold project only reaching feasibility study stage in April 2025, bringing in JDS Energy & Mining at this point suggests Osisko Development is trying to compress the typical study-to-execution lag seen in many Canadian gold projects in our coverage.

    Osisko Development and Barkerville Gold Mines appear far less often in our recent gold project coverage than larger Canadian producers, so a contracted build at Cariboo may be important for them to establish a construction and operating track record comparable to mid-tier peers.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers
    Mining
    about 7 hours ago

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    Brightstar Resources has reported its largest Sandstone result at the Two Mile Hill deposit in WA, intersecting 305m at 2.66g/t gold from 503m depth in diamond hole TMHDD26005. The interval contains multiple high-grade zones, including 4.1m at 26.1g/t, 5.5m at 25.2g/t and 4m at higher-grade material within the broader mineralised envelope. The scale and continuity of this intercept materially upgrade the grade-times-width profile of Two Mile Hill, supporting potential for bulk underground mining scenarios and further deep drilling.

    BHP record WA community spend: procurement signals for mining contractors
    Mining
    about 7 hours ago

    BHP record WA community spend: procurement signals for mining contractors

    BHP has reported a record $1.1 billion in community expenditure across Western Australia for FY2026, including $627 million in procurement from Indigenous and Traditional Owner businesses. The miner’s 2026 Western Australia Community Development Report also details more than $850 million in payments to local suppliers, councils and community partners, signalling a heavy regional spend alongside its iron ore and nickel operations. For contractors and service providers, the scale of Indigenous and local sourcing points to strong demand for WA-based capability and joint ventures.

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers
    Mining
    about 7 hours ago

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers

    AIC Mines has closed a $70 million acquisition of Materra Metals, securing 100 per cent ownership of the Mt Cuthbert copper project in north‑west Queensland and adding 18.7 million tonnes of copper resources to its portfolio. The company plans a major drilling program in 2027, signalling a shift from resource consolidation to definition drilling and potential mine planning at Mt Cuthbert. For geotechnical and mine planners, the deal points to upcoming demand for pit design, hydrogeology, and infrastructure studies in a historically underdeveloped copper district.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental