Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Northern Star gold hubs: deep extensions and design takeaways for mine planners

    December 8, 2025|

    Reviewed by Tom Sullivan

    Northern Star gold hubs: deep extensions and design takeaways for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Northern Star Resources reports strong exploration results across its Australian hubs, with deep extensions and high‑grade gold intercepts at operations including Kalgoorlie Consolidated Gold Mines in Western Australia. Drilling has identified mineralisation continuing at depth beneath existing workings, with multiple emerging zones that could support life‑of‑mine extensions and higher‑grade feed to existing mills. For mine planners and geotechs, the focus now shifts to underground access design, ground support in deeper stress regimes, and sequencing to integrate new stopes into current production.

    Technical Brief

    • Deep drilling beneath existing workings will require revised geotechnical domains and updated stress modelling for design.
    • Longer underground declines to access deeper ore will increase exposure hours, driving stricter ground control management plans.
    • Additional drilling platforms and underground rigs necessitate refreshed traffic management, exclusion zones and ventilation checks.
    • Integration of new stopes into active areas raises seismic hazard, mandating enhanced microseismic monitoring and trigger action response plans.
    • Mine rescue coverage must extend to deeper levels, with revised escapeway layouts and refuge chamber spacing.
    • Ground support standards and QA/QC (e.g. pull testing, resin mixing control) will need tightening at depth.
    • Similar brownfield gold operations extending below current levels are likely to face comparable ground control and emergency response upgrades.

    Our Take

    Northern Star Resources is one of the few gold producers in our database with multiple WA hubs, so strong results “across all hubs” at assets like Kalgoorlie Consolidated Gold Mines signal portfolio-wide flexibility to re-sequence mining fronts if one centre underperforms.

    Within our 64 gold-tagged pieces, WA operations feature heavily, and this concentration suggests that maintaining consistent performance at Kalgoorlie is strategically important for sustaining Australia’s role as a top-tier gold producer in the medium term.

    Among the 424 Projects/Safety-tagged items, only a handful combine both tags for large, mature assets like Kalgoorlie Consolidated Gold Mines, indicating that Northern Star’s safety performance there will be closely watched as a benchmark for brownfield underground operations in WA.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Perpetua–INL minerals recovery pilot: flowsheet and design insights for mine engineers

    Perpetua Resources has signed an agreement with Idaho National Laboratory, operated by Battelle Energy Alliance, to host, commission and run a flexible, modular pilot plant to recover critical and defence-related minerals, including antimony, from Perpetua’s orebodies. The pilot is expected to test flowsheets for selective antimony recovery alongside other strategic elements, using containerised process modules that can be reconfigured for different ore types and chemistries. Outcomes will inform full‑scale processing design for the Stibnite Gold Project and potential US domestic supply chains for military‑grade antimony products.

    Mining
    about 7 hours ago

    Aurecon–Rio Tinto Iron Ore sustaining capital: key brownfield insights for engineers

    Aurecon has been appointed Engineering Program Partner for Rio Tinto Iron Ore’s Sustaining Capital teams in Western Australia from October 2025 to October 2028, extending its long-running role on Pilbara brownfield projects. The mandate covers multi‑disciplinary engineering for fixed plant, rail and port assets across RTIO’s iron ore network, including structural upgrades, materials handling improvements and life‑extension works on existing processing infrastructure. For geotechnical and civil teams, the partnership signals continued demand for staged upgrades, brownfield tie‑ins and asset integrity assessments rather than major greenfield expansions.

    Mining
    about 7 hours ago

    Iron Mine Contracting–Covalent Mt Holland deal: mining scope and risks for planners

    Iron Mine Contracting has secured a 39‑month mining services contract with Covalent Lithium to deliver drill, blast, load and haul, and run‑of‑mine management at the Mt Holland hard‑rock lithium operation in Western Australia’s Goldfields. The scope covers full open‑pit production support for Covalent’s Mt Holland mine and concentrator, which will feed spodumene concentrate to the company’s Kwinana Refinery now in commissioning. The deal signals long‑term third‑party involvement in both production drilling and material movement at one of Western Australia’s key lithium projects.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy