Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Op-Ed
    Standard/Guideline

    NI 43-101 and online disclosure: policy takeaways for project teams

    February 13, 2026|

    Reviewed by Tom Sullivan

    NI 43-101 and online disclosure: policy takeaways for project teams

    First reported on MINING.com

    30 Second Briefing

    NI 43-101’s standardised technical reports and qualified person requirements stabilised disclosure after Bre-X, but Erik Groves, corporate strategy and in-house counsel at Morgan Companies, argues they now mask chronic diluters whose projects never advance despite repeated financings and high G&A. With Canadian National Policy 51-201 still warning against “sporadic” online rumour correction on chat rooms and bulletin boards, legal advice often keeps issuers off X, YouTube and Reddit while retail investors crowdsource geology and drill-interval analysis. Groves calls for a defined safe harbour allowing video documentation of fieldwork, plain-language geological reasoning and public misinformation correction, without pre-releasing material results or implying unsupported resources.

    Technical Brief

    • Uniform report templates, boilerplate risk factors and similar slide-deck structures make weak and strong issuers visually indistinguishable to non-specialists.
    • Chronic diluters are characterised by repeated equity raises, flat or declining metreage, and persistently high G&A relative to field spend.
    • Rebranding or optioning the same ground to new vehicles is flagged as a recurring pattern within compliant-but-stagnant issuers.
    • Dense 43-101 reports are described as effectively unread by most retail investors, shifting attention to secondary commentary channels.
    • Experienced institutions rely on private technical networks and long-term behavioural patterns, creating an information asymmetry versus retail holders.
    • Risk focus has shifted from catastrophic assay fabrication to slow value destruction via dilution and non-progression, which NI 43-101 does not directly regulate.

    Our Take

    Within the 140 Policy stories in our database, Canada-focused pieces around disclosure standards like NI 43-101 are disproportionately linked to market-sensitive commodities such as gold, copper and uranium, underscoring how any tightening or reinterpretation of these rules can quickly affect project valuations and financing windows.

    The overlap of this op-ed’s commodity set (coal, copper, gold, uranium and broader critical minerals) with recent MINING.COM power-ranking coverage suggests that the projects most exposed to disclosure and guidance risk are also those attracting the bulk of current investor attention, particularly in North American jurisdictions.

    Because the United States features heavily in related policy and security-zone coverage for copper and critical minerals, any Canadian evolution of NI 43-101-style standards is likely to be watched by US regulators and exchanges as a reference point for harmonising expectations on technical reporting across the border.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gateway 3 delays and 5,000 empty homes: regulatory lessons for project teams
    Policy
    about 15 hours ago

    Gateway 3 delays and 5,000 empty homes: regulatory lessons for project teams

    Delays at the Building Safety Regulator’s Gateway 3 stage are linked by law firm Irwin Mitchell to 44 undecided schemes and 5,594 completed higher-risk residential units remaining unoccupied, with one case waiting 550 days against an eight‑week target. Of 158 Gateway 3 applications in 2023, 55 took more than three months for a decision, raising concerns over cashflow impacts on developers and handover timing for residents. The BSR disputes the interpretation, stating no new-build higher-risk building that passed Gateway 2 has yet applied for Gateway 3 and that current cases are mainly transitional legacy projects with significant safety issues.

    Passengers’ Council powers debate: implications for UK rail designers and asset teams
    Policy
    3 days ago

    Passengers’ Council powers debate: implications for UK rail designers and asset teams

    MPs on Parliament’s transport select committee are questioning whether the Railways Bill’s proposed Passengers’ Council will have any real enforcement powers to deliver a fully accessible national rail network. Concerns centre on the council’s ability to compel infrastructure managers and train operators to retrofit step-free access, tactile paving and compliant boarding interfaces across thousands of stations and platforms. For designers and asset owners, the outcome will influence how strongly accessibility standards are mandated in future station upgrades, platform works and rolling stock procurement.

    NSW Demerit Point Reward Program: behavioural safety lever for road engineers
    Policy
    4 days ago

    NSW Demerit Point Reward Program: behavioural safety lever for road engineers

    New South Wales has introduced a bill to make its Demerit Point Reward Program permanent, following a trial that began in 2023 to encourage safer driving behaviour. The scheme rewards motorists who avoid new offences over a defined period by restoring demerit points, directly affecting licence suspension thresholds and enforcement loads on the road network. For road and traffic engineers, the programme’s permanence would lock in a behavioural lever that can be modelled alongside physical safety upgrades, speed zoning and enforcement camera placement.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.