Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Product
    Projects

    Metso Grande Series screening: flowsheet and uptime gains for plant engineers

    December 8, 2025|

    Reviewed by Tom Sullivan

    Metso Grande Series screening: flowsheet and uptime gains for plant engineers

    First reported on Australian Mining

    30 Second Briefing

    Metso has launched its Grande Series of high-performance mining screens, engineered for heavy-duty classification in large-capacity crushing and screening circuits. The range targets high-throughput operations with optimised stroke, speed and deck configurations to increase screening efficiency and uptime compared with conventional units. For plant designers and process engineers, the new series offers a standardised yet scalable platform aimed at simplifying flowsheet design, reducing maintenance intervals and improving overall circuit performance in hard-rock and ore applications.

    Technical Brief

    • Grande Series units are configured as multi-slope vibrating screens for high-capacity classification in primary circuits.
    • Designs target heavy-duty applications in hard-rock mining, with reinforced side plates and cross-members.
    • Screen decks are engineered to accept modular media, enabling rapid change-out and tailored aperture layouts.
    • Drive systems use high-energy exciters sized for large stroke amplitudes under high material bed depths.
    • Structural layout accommodates large feed chute loads and high drop heights typical of primary crusher discharge.

    Our Take

    Metso’s Grande Series launch in Australia comes as the company is also supplying major process equipment to Harmony’s Eva copper project in Queensland, signalling that new product lines are likely to be specified quickly into greenfield designs rather than only retrofits.

    Across our mining product coverage, Metso appears repeatedly with both screening and comminution solutions, suggesting operators in Australia may increasingly favour single-vendor flowsheets to simplify integration, spares and performance guarantees.

    The cluster of December 2025 items on Metso’s screens, cooling towers and copper plant packages indicates a coordinated refresh of its offering, which could influence how Australian project teams standardise plant layouts and procurement specs over the next design cycle.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mojave Desert rare earth mining lawsuit: permitting and project risks for engineers
    Mining
    about 4 hours ago

    Mojave Desert rare earth mining lawsuit: permitting and project risks for engineers

    Environmental group National Parks Conservation Association, represented by Earthjustice, is suing the US Department of the Interior and National Park Service over approval of Dateline Resources’ Colosseum rare earth and gold project inside the Mojave National Preserve’s Clark Mountain region, about 10 km from MP Materials’ Mountain Pass mine. The suit alleges NPS authorised mining without a valid plan of operations or required permits, breaching multiple federal laws and long-standing park protections. Dateline says exploration and project work will continue, but its shares fell 9.5%, cutting market capitalisation to about A$1.23 billion.

    Mangrove lithium refinery in British Columbia: process and capex insights for engineers
    Mining
    about 6 hours ago

    Mangrove lithium refinery in British Columbia: process and capex insights for engineers

    Mangrove Lithium has commissioned North America’s first commercial electrochemical lithium refinery in Delta, British Columbia, with capacity to produce 1,000 tonnes per year of battery-grade lithium hydroxide—enough for about 25,000 EVs—using an electrolyser and membrane system that regenerates sulfuric acid and eliminates sodium sulfate waste. The plant can process feed from brines, hard rock, clays, geothermal direct lithium extraction and battery recycling, reducing chemical consumption and carbon intensity versus conventional routes. Backed by up to C$116 million from the Canada Growth Fund and C$21.9 million in conditional federal support, Mangrove is advancing a 20,000 t/y Quebec refinery and has an MoU to source spodumene from the North American Lithium mine.

    Copper price nears record high: smelter signals and TC/RC squeeze for mine planners
    Mining
    about 15 hours ago

    Copper price nears record high: smelter signals and TC/RC squeeze for mine planners

    Copper futures in New York climbed more than 5% this week to $6.11/lb ($13,480/t), nearing January’s record close as satellite data show Chinese smelters running at unprecedented levels. Earth-i’s SAVANT index reports China’s inactive capacity at just 3.9%, driving an all-time high active capacity of 10.73 Mt, 775,000 t above a year ago, while North American smelter inactivity has surged to 32.3%. Spot TC/RCs have flipped from +$50/t in January 2024 to about –$78.50/t, with Antofagasta’s 2026 benchmark with a Chinese smelter settling at zero, the lowest on record.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.