Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability
    Product

    Mangrove lithium refinery in British Columbia: process and capex insights for engineers

    April 18, 2026|

    Reviewed by Tom Sullivan

    Mangrove lithium refinery in British Columbia: process and capex insights for engineers

    First reported on MINING.com

    30 Second Briefing

    Mangrove Lithium has commissioned North America’s first commercial electrochemical lithium refinery in Delta, British Columbia, with capacity to produce 1,000 tonnes per year of battery-grade lithium hydroxide—enough for about 25,000 EVs—using an electrolyser and membrane system that regenerates sulfuric acid and eliminates sodium sulfate waste. The plant can process feed from brines, hard rock, clays, geothermal direct lithium extraction and battery recycling, reducing chemical consumption and carbon intensity versus conventional routes. Backed by up to C$116 million from the Canada Growth Fund and C$21.9 million in conditional federal support, Mangrove is advancing a 20,000 t/y Quebec refinery and has an MoU to source spodumene from the North American Lithium mine.

    Technical Brief

    • Lithium sulphate brine is electrolysed, transporting lithium across a membrane while regenerating sulphuric acid for reuse.
    • Eliminating sodium hydroxide addition removes the sodium sulphate waste stream, leaving only minor water losses.
    • Feed flexibility includes brines, hard-rock concentrates, clays, geothermal DLE outputs and black-mass from battery recycling.
    • Direct lithium extraction is treated as an upstream concentration step, not a competing refining technology.

    Our Take

    The related MoU with Elevra Lithium to supply up to 144,000 t/y of North American Lithium (NAL) spodumene concentrate from 2028 positions Mangrove Lithium’s British Columbia and planned Quebec facilities as a dedicated downstream outlet for that mine, reducing exposure to Chinese converters that currently dominate about 96% of global lithium refining capacity among the top three countries.

    The presence of BMW i Ventures and Breakthrough Energy Ventures in the C$116 million financing package signals that Mangrove Lithium is being treated less as a single‑asset processor and more as a platform play in North American lithium chemicals, which may influence how other Canadian critical minerals projects structure funding rounds captured in our recent Mining coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mojave Desert rare earth mining lawsuit: permitting and project risks for engineers
    Mining
    about 6 hours ago

    Mojave Desert rare earth mining lawsuit: permitting and project risks for engineers

    Environmental group National Parks Conservation Association, represented by Earthjustice, is suing the US Department of the Interior and National Park Service over approval of Dateline Resources’ Colosseum rare earth and gold project inside the Mojave National Preserve’s Clark Mountain region, about 10 km from MP Materials’ Mountain Pass mine. The suit alleges NPS authorised mining without a valid plan of operations or required permits, breaching multiple federal laws and long-standing park protections. Dateline says exploration and project work will continue, but its shares fell 9.5%, cutting market capitalisation to about A$1.23 billion.

    Copper price nears record high: smelter signals and TC/RC squeeze for mine planners
    Mining
    about 16 hours ago

    Copper price nears record high: smelter signals and TC/RC squeeze for mine planners

    Copper futures in New York climbed more than 5% this week to $6.11/lb ($13,480/t), nearing January’s record close as satellite data show Chinese smelters running at unprecedented levels. Earth-i’s SAVANT index reports China’s inactive capacity at just 3.9%, driving an all-time high active capacity of 10.73 Mt, 775,000 t above a year ago, while North American smelter inactivity has surged to 32.3%. Spot TC/RCs have flipped from +$50/t in January 2024 to about –$78.50/t, with Antofagasta’s 2026 benchmark with a Chinese smelter settling at zero, the lowest on record.

    Mining
    about 19 hours ago

    BHP Invent–ENFI–BGRIMM MOUs: flowsheet innovation insights for process engineers

    BHP Invent has signed two Memorandums of Understanding with China ENFI, a subsidiary of China Metallurgical Group Corporation, and BGRIMM Technology Group to co-develop technologies for mineral processing, leaching and complex ore treatment. The partnerships focus on flowsheet innovation and metallurgical testwork for challenging ores, including operations in high-altitude environments common to western China. For miners, this signals potential new process routes and reagent schemes for low-grade or refractory deposits, with Chinese engineering houses positioned as key design and pilot-plant partners.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.