Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    La Mancha sells down Endeavour Mining stake: asset and jurisdiction signals for mine planners

    January 9, 2026|

    Reviewed by Joe Ashwell

    La Mancha sells down Endeavour Mining stake: asset and jurisdiction signals for mine planners

    First reported on MINING.com

    30 Second Briefing

    La Mancha Resource Capital has sold a 3.5% stake in Endeavour Mining via a C$71.25-per-share bought deal worth about C$605 million, cutting its holding from roughly 15% to 11% while retaining board representation through Naguib Sawiris. Endeavour, now valued around C$17.5 billion after a 191% share price rise in 12 months, produces in the mid- to high-900,000-oz.-per-year range from West African assets including Houndé (Burkina Faso) and Ity and Agbaou (Côte d’Ivoire). The move comes as Burkina Faso has nationalised Endeavour’s former Boungou and Wahgnion mines, paying about $80 million and asserting full state control.

    Technical Brief

    • Bought deal priced at C$71.25 per share generated gross proceeds of about C$605 million.
    • La Mancha fund previously held 35.3 million Endeavour shares, equating to ~15% on a non‑diluted basis.
    • Fund assets under management were about US$1.7 billion in November, so Endeavour exposure had become concentrated.
    • Share price closed at C$77.61 before the deal, then dropped 6.1% to C$72.91 on announcement.
    • La Mancha states the sale is driven by leverage reduction and portfolio rebalancing, not asset‑level concerns.
    • Board representation is retained via Naguib Sawiris, maintaining direct influence over Endeavour’s capital allocation and project pipeline.
    • Nationalisation of Boungou and Wahgnion followed collapse of a >US$300 million sale agreement with Lilium Mining.

    Our Take

    Endeavour Mining’s focus on West African gold (Houndé, Ity, Wahgnion, Boungou) sits within a relatively crowded field in our database, where several Sahel gold operators have recently faced heightened sovereign and security risk, suggesting La Mancha’s partial exit may also be a portfolio de-risking move rather than a pure valuation call.

    With La Mancha’s assets under management at about $1.7 billion and its remaining 11% stake in Endeavour, the sale frees up a material slice of capital that can be redeployed into higher-growth or distressed opportunities in gold and uranium, which dominate much of our recent ‘Projects’ coverage in West Africa and the Sahel.

    The reference to Niger as the 7th-largest uranium producer and to GoviEx/Global Atomic aligns this piece with a cluster of uranium and critical minerals stories in our database, signalling that capital originally tied up in a mature gold position like Endeavour could be rotated towards earlier-stage uranium or critical mineral plays in Africa and the US.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 8 hours ago

    Derrick Experience Center: fine screening test gains and risks for plant engineers

    Derrick Corporation has opened its Derrick Experience Center (DEX Center) in January 2026 to mark its 75th anniversary, creating a dedicated test hub for advanced fine screening technology. The “first-of-its-kind” facility is designed for current and prospective customers to run full-scale trials on Derrick high-frequency screens and Polyweb® urethane panels under controlled conditions, rather than relying solely on on-site pilots. The centre is intended to shorten test campaigns, de-risk screen selection, and optimise cut size and throughput for fine coal, iron ore, base metals and industrial minerals circuits.

    University of Arizona mine waste project: key processing insights for engineers
    Mining
    about 21 hours ago

    University of Arizona mine waste project: key processing insights for engineers

    A $3.6 million Arbor-funded University of Arizona Tailings Center project, led by mining engineer Dr Isabel Barton, is evaluating whether 17.5 billion tons of historic copper tailings in Arizona—growing by ~100 million tonnes per year—can be reprocessed to recover critical minerals and reduce environmental risk. The team is combining statewide and UAV-based remote sensing, industry tailings datasets, drilling and surface sampling, mineralogical characterisation and techno-economic analysis using magnetic separation and basic leaching. Early work has identified unexpected mineral occurrences, including arsenic, zinc and possibly tungsten, which could justify flowsheet changes to keep these elements out of future tailings.

    HSBC’s $5,000 gold call: price volatility and planning notes for mine projects
    Mining
    1 day ago

    HSBC’s $5,000 gold call: price volatility and planning notes for mine projects

    Gold could spike to $5,050/oz in the first half of 2026 before potentially correcting to as low as $3,950/oz later in the year, according to HSBC’s latest forecast, which assumes elevated geopolitical risk and ongoing US Federal Reserve rate cuts. The bank now projects an average 2026 price of $4,587/oz and an end‑2026 level of $4,450/oz, with “high volatility” driven by central bank buying, a weaker US dollar and flows into gold‑backed ETFs. Longer term, HSBC lifts its average forecasts to $4,625/oz for 2027, $4,700/oz for 2028 and $4,775/oz for 2029.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.