Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Failure
    Safety

    Kollam highway embankment failure: design and fill lessons for road engineers

    December 7, 2025|

    Reviewed by Joe Ashwell

    Kollam highway embankment failure: design and fill lessons for road engineers

    First reported on Geoengineer.org – News

    30 Second Briefing

    A newly built embankment along National Highway 66 at Mylakkadu in Kollam suddenly collapsed, trapping several vehicles including a school bus and opening deep ground fissures across the service road and adjacent plots. The failure occurred on a recently widened section of NH66, where fill had been placed to raise the carriageway above surrounding low-lying land, and eyewitnesses reported no prior signs of distress. State authorities have ordered a technical investigation into embankment design, fill quality, drainage provision and construction supervision, with traffic now diverted and the affected stretch closed.

    Technical Brief

    • Failure appears localised to the newly raised approach fill near Mylakkadu junction on NH66.
    • Kerala PWD has constituted a multi-disciplinary technical committee including geotechnical, highway and structural engineers.
    • Investigation scope reportedly covers design checks, borrow material sources, compaction records and staged construction sequencing.
    • Drainage adequacy around the widened carriageway, including side drains and cross-drainage connectivity, is a key focus.
    • Officials indicated boreholes and trial pits will be sunk through the embankment and underlying soft strata.
    • Continuous monitoring of crack propagation, settlement markers and groundwater levels is planned before any traffic restoration.
    • Remedial options under discussion include partial reconstruction with improved drainage and ground improvement in low-lying sections.
    • Incident is prompting review of recent NH66 widening packages in Kerala for similar high embankment configurations.

    Our Take

    Within the 204 Infrastructure stories in our database, relatively few Failure-tagged items involve highway embankments, which suggests this Kollam event will likely be scrutinised as a design, drainage, and construction-quality case study rather than a routine maintenance issue.

    For regions like Kollam and Mylakkadu with intense monsoon loading, embankment failures often trigger rapid revisions to local slope-stability criteria and groundwater control details, which can tighten specifications for ongoing and planned road projects in the same corridor.

    Across the 530 tag-matched pieces combining Projects, Failure, and Safety, post-incident investigations frequently lead to mandatory independent geotechnical reviews on similar assets nearby, so operators working on other highway sections around Kollam should expect closer regulatory oversight of fill materials and compaction records.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 10 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 9 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.