Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Kalgoorlie vanadium battery project: supply chain signals for mine planners

    November 25, 2025|

    Reviewed by Joe Ashwell

    Kalgoorlie vanadium battery project: supply chain signals for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Western Australia’s Government is seeking partners to deliver a vanadium redox flow battery energy storage system in Kalgoorlie, intended as a flagship project to anchor a local vanadium supply chain. The installation will use vanadium electrolyte produced from WA ore, linking upstream mining and processing with downstream battery manufacturing and grid-scale storage. For miners and materials suppliers, the project signals state backing for vanadium extraction, refining and electrolyte production capacity in the Goldfields region.

    Technical Brief

    • Procurement seeks a partner to design, supply, install and commission the Kalgoorlie vanadium redox flow battery.

    Our Take

    Vanadium appears only sporadically in our mining coverage compared with dominant battery metals like lithium and nickel, so a Kalgoorlie-based project signals early-stage diversification of Western Australia’s energy-storage commodity base beyond its traditional focus.

    Locating a vanadium-linked battery asset in Kalgoorlie leverages an established mining services hub, which can shorten supply-chain build‑out times compared with greenfield industrial locations elsewhere in Australia.

    Among the 101 Projects/Sustainability-tagged pieces in our database, most Australian items centre on decarbonising iron ore and gold operations, so a vanadium-focused initiative in Western Australia suggests operators are starting to treat long-duration storage as core enabling infrastructure rather than a peripheral pilot.

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sandvik mining talent report: key workforce design takeaways for engineers
    Mining
    about 7 hours ago

    Sandvik mining talent report: key workforce design takeaways for engineers

    New research from Sandvik’s global engineering group points to a shrinking pipeline of mining engineers, with survey data showing young professionals rank decarbonisation projects, automation and digital systems above traditional pit or plant roles. Respondents cited reluctance to work FIFO rosters and in remote camps, and a preference for hybrid city-based roles linked to remote operations centres and OEM technology hubs. Sandvik argues miners must redesign graduate pathways around battery-electric fleets, data analytics and equipment condition monitoring to compete with infrastructure, renewables and tech employers.

    Timken housed bearing units: reliability and maintenance gains for mine plant teams
    Mining
    about 8 hours ago

    Timken housed bearing units: reliability and maintenance gains for mine plant teams

    Timken is promoting a broad portfolio of housed bearing units for mining applications, including solid-block spherical roller units and split-block designs aimed at high-load, contaminated environments on conveyors, crushers and vibrating screens. The units typically integrate triple-lip or labyrinth seals, ductile iron or cast steel housings and factory-set clearances to cope with misalignment, shock loads and abrasive fines common in fixed plant. For maintenance teams, the focus is on longer relubrication intervals, reduced unplanned stoppages and easier swap-out in cramped, dirty locations.

    Rio Tinto renewable diesel trial: HVO fleet switch insights for mine engineers
    Mining
    about 8 hours ago

    Rio Tinto renewable diesel trial: HVO fleet switch insights for mine engineers

    Rio Tinto and Viva Energy have completed a large-scale renewable diesel trial, showing haul trucks and other heavy mobile equipment can switch from conventional diesel with no changes to engines, fuel systems or maintenance schedules. The trial used drop-in hydrotreated vegetable oil (HVO)-type fuel in standard high-horsepower mining fleets, validating cold-start performance, fuel consumption and engine wear against OEM limits. Results indicate sites with existing diesel storage and distribution can cut Scope 1 emissions from mobile equipment rapidly by substituting fuel rather than retrofitting fleets.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy