Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Hastings–Enuo niobium research deal: flowsheet and revenue notes for mine planners

    January 28, 2026|

    Reviewed by Joe Ashwell

    Hastings–Enuo niobium research deal: flowsheet and revenue notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Hastings Technology Metals has signed a binding technical services and research agreement with Enuo Holdings to investigate boosting niobium output alongside rare earths in its Australian project portfolio. The collaboration will focus on process development and metallurgical testwork to recover niobium from existing ore streams, potentially adding a secondary revenue source without major changes to mine plans. For mine planners and plant designers, the move signals growing interest in multi-commodity flowsheets that integrate niobium recovery into rare earth processing circuits.

    Technical Brief

    • For other multi-commodity rare earth projects, similar agreements de-risk early-stage flowsheet diversification before committing capital.

    Our Take

    Niobium appears in only a handful of keyword-matched pieces in our database, so Hastings Technology Metals moving into this space in Australia signals a relatively early-stage positioning in a niche alloy and battery-material market compared with more crowded lithium or rare earths coverage.

    For Australia-focused mining stories tagged as Projects and Contract Award, most recent items centre on iron ore, gold and lithium, which suggests niobium-related work may face a less congested permitting and project pipeline but also a thinner local supply chain and expertise base.

    Hastings Technology Metals is better known in our coverage for critical minerals rather than bulk commodities, so a niobium-focused research agreement aligns it with other specialty-metals players targeting higher-value downstream applications rather than pure volume growth.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    about 13 hours ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners
    Mining
    about 14 hours ago

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners

    Barrick Mining has warned of “significant increases” to the capital budget and schedule for the 50%-owned Reko Diq copper-gold project in Balochistan, where Phase 1 was previously costed at US$5.6–6.0 billion and Phase 2 at US$3.3–3.6 billion, with first production targeted by end-2028. Citing escalating security risks in Pakistan and the wider region, Barrick will slow field development and extend the technical and financing review to mid‑2027, while keeping the project under “active management” with reduced capital spend. The porphyry deposit, holding an estimated 15 million tonnes of copper reserves and modelled for a 37‑year mine life, remains central to Barrick’s Tier 1 copper strategy and its long-term community commitments in Balochistan.

    Orica tech for smaller North American mines: blast design gains for engineers
    Mining
    about 17 hours ago

    Orica tech for smaller North American mines: blast design gains for engineers

    Orica is targeting smaller North American mines and quarries with the same digital blasting toolkit used on large sites, including its BlastIQ cloud platform for blast design and performance tracking and on-bench digital loading systems. Area Business Manager Elliott Giles told IM that these operations, aggregated, form a major explosives volume market, and are now adopting electronic detonators and precise blast modelling to cut oversize and improve fragmentation. For geotechs and drill‑and‑blast engineers, the shift means more consistent burden control, tighter vibration management and better data for pit wall stability assessment even on “small” jobs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.