Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Glencore copper expansion to 2035: capex, mine life and M&A lens for engineers

    February 18, 2026|

    Reviewed by Tom Sullivan

    Glencore copper expansion to 2035: capex, mine life and M&A lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Glencore is accelerating its copper strategy after securing a land access deal with Gécamines for Kamoto Copper Company in Kolwezi, unlocking restricted ore zones, extending mine life into the mid‑2040s and supporting a 300,000‑tonnes‑per‑year output target. Analysts estimate the group aims to almost double copper production by 2035 at a capital intensity of about $16,200/t Cu‑equivalent, with peak development capex near $4.5 billion in 2031 and total investment potentially reaching $11 billion. Management plans to self‑fund growth, while considering partners at Agua Rica and El Pachón and a 40% sale of its DRC copper‑cobalt business.

    Technical Brief

    • Analysts estimate copper growth capex at $16,200/t Cu‑equivalent capacity, or $20,630/t on copper‑only basis.
    • Peak development spend is projected around $4.5 billion in 2031, when four major copper projects overlap.
    • Including sustaining and other capital, total group investment at peak is forecast near $11 billion.
    • Consensus sees EBITDA rising from ~$12.8 billion in 2025 to $16–20 billion by 2030 on higher copper volumes.

    Our Take

    The abandoned mega-merger with Rio Tinto covered in the 5–6 February items would have created a group controlling about 7% of global copper output, so Glencore’s plan to almost double copper production to 2035 now effectively has to be delivered through its own portfolio and targeted M&A rather than via scale from Rio’s iron ore and bauxite base.

    With net debt at $11.2 billion versus a $10 billion target and sustaining/other capex guided at $5.5–6.5 billion, Glencore’s room for large cash M&A in copper is likely to hinge on how quickly EBITDA can move from the 2025 consensus of $12.8 billion towards the $16–20 billion range forecast for 2030.

    The potential sale of a 40% stake in the DRC copper–cobalt business (including KCC in the Kolwezi hub) sits against other DRC-linked moves in our coverage, such as Ivanhoe–Gécamines’ Project Vault routing Kipushi concentrates to the US, signalling that DRC assets are being actively reshaped to fit Western supply-chain and balance-sheet objectives rather than simply expanded at any cost.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners
    Mining
    about 12 hours ago

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners

    Canadian processor pH7 Technologies is expanding its Vancouver facility, backed by up to C$4 million from NRC IRAP, to scale its organo-electrochemical platform that recovers platinum, palladium and rhodium from secondary materials without toxic reagents or tailings wastewater. The commercial plant already processes spent catalytic converters, producing 30,000–40,000 oz of platinum-equivalent PGMs per year under a tolling and offtake model involving partners such as Mitsubishi. pH7 is now piloting electrochemically generated oxidants to heap leach chalcopyrite and other sulphide ores without cyanide, targeting on-site mine deployment within 1–2 years across South America, Africa and Australia.

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    about 17 hours ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    1 day ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.