Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Florence Copper ICSR-SX/EW start-up: design and groundwater notes for engineers

    March 3, 2026|

    Reviewed by Joe Ashwell

    Florence Copper ICSR-SX/EW start-up: design and groundwater notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Florence Copper in Arizona has produced its first copper cathodes from Taseko Mines’ new commercial in-situ copper recovery (ICSR) operation coupled with a solvent extraction/electrowinning (SX/EW) plant, following electrowinning start-up in late February. The project uses in-situ leaching of a deep porphyry deposit and on-site SX/EW to generate LME-grade cathode without a concentrator, tailings storage facility or smelter. For geotechnical and hydrogeological teams, the move to full commercial ICSR-SX/EW operation sharpens focus on leach-wellfield design, solution containment and long-term groundwater management.

    Technical Brief

    • Early cathode harvest provides initial operational data for solution chemistry control and current efficiency optimisation.
    • Plant performance in these first weeks will calibrate leach rates, wellfield injection–recovery balance and reagent dosing.
    • Hydrogeological containment assumptions now begin to be tested against real production-scale flow and drawdown behaviour.
    • For similar porphyry deposits, Florence’s ramp-up offers a live reference for commercial ICSR schedule and commissioning risk.

    Our Take

    Within our copper coverage, in-situ recovery projects like Florence Copper in Arizona remain rare compared with conventional open pits, suggesting Taseko Mines is positioning this asset as a lower-disturbance, potentially lower-carbon source of United States copper supply.

    Among United States copper items in our database, Arizona continues to dominate project newsflow, which likely reflects both the state’s established permitting framework for copper and the strategic push to secure domestic supply for the energy transition.

    Across the 2048 Projects/Sustainability-tagged pieces, only a small subset combine both tags for copper in the United States, indicating Florence Copper is being framed not just as a growth project for Taseko Mines but as a test case for more publicly acceptable copper extraction methods in populated regions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers
    Mining
    1 day ago

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers

    Buffalo Potash has secured Saskatchewan approval to complete construction and operate its Disley initial production module, a 125,000 t/y soluble-grade potash facility 50 km northwest of Regina using a patented horizontal line-drive brine circulation method through parallel horizontal wells. The C$41.5 million module will test selective underground dissolution of potassium chloride with sodium-chloride-saturated brine and supply local agriculture, drilling-fluid markets and potassium-chloride brine for regional oilfields, ahead of planned 500,000 t/y Disley East and West expansions to about 1.13 Mt/y. The permit, which runs to 30 April and excludes future modules, requires groundwater characterisation, air-quality compliance and financial assurance, while the project proceeds without a feasibility study or declared reserves, elevating technical and economic risk.

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners
    Mining
    1 day ago

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners

    Exiro Minerals, Orion Resource Partners and Canada Growth Fund have acquired an 81.1% stake in Vale’s Thompson nickel operations in northern Manitoba, committing up to US$200 million to sustain and develop the six-decade-old complex. The new vehicle, Exiro Nickel, takes over day-to-day control of two operating underground mines, the adjacent concentrator and exploration ground along the 135 km Thompson Nickel Belt, while Vale Base Metals retains an 18.9% interest. A multi-year offtake agreement keeps Vale buying nickel concentrate from the Thompson mill, providing a defined outlet for future production.

    Mining
    1 day ago

    Moeve–Emerita 100% renewable diesel deal in Spain: decarbonisation notes for mines

    Moeve and Emerita Resources have signed Spain’s first mining-sector agreement to deploy 100% renewable diesel (HVO) at industrial scale, designating Moeve as preferred supplier of this second-generation biofuel. The HVO, derived from waste and residue feedstocks rather than food crops, is claimed to cut lifecycle CO2 emissions by up to 90% compared with conventional diesel. For mine operators, the drop-in fuel compatibility with existing diesel engines offers a near-term route to decarbonise haul trucks and auxiliary fleets without major equipment changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental