Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Flexco Polyurethane Canoe Liner: design and wear insights for conveyor engineers

    January 13, 2026|

    Reviewed by Joe Ashwell

    Flexco Polyurethane Canoe Liner: design and wear insights for conveyor engineers

    First reported on International Mining – News

    30 Second Briefing

    Flexco has launched a Polyurethane Canoe Liner designed to fit inside conveyor skirtboard systems, providing immediate impact absorption at loading points to protect stringers, skirt plates and idlers from heavy material drop. The moulded polyurethane sections form a continuous “canoe” around the loading zone, reducing fugitive material, minimising liner gaps and lowering maintenance compared with traditional steel or rubber wear plates. Flexco positions the liner as part of its heavy-duty belt conveyor protection (HD BCP) range, targeting high-impact applications in mining and bulk handling plants.

    Technical Brief

    • Installation occurs inside existing skirtboard systems, allowing retrofits without modifying stringers or idler frames.

    Our Take

    Within the 575 Mining stories in our database, Flexco appears mainly in product-focused pieces rather than project finance or M&A, signalling its role as an equipment and consumables supplier rather than an asset owner or operator.

    Among the 1,104 tag-matched ‘Projects’ and ‘Product’ items, conveyor-related solutions like those from Flexco typically feature in brownfield optimisation work, where operators seek incremental throughput or reduced downtime without major capex.

    For mining projects already locked into fixed plant layouts, retrofit-friendly products from suppliers such as Flexco often get specified late in design or early in ramp-up, which can materially affect spillage control and maintenance access without triggering design re-approval.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams
    Mining
    1 day ago

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams

    A ransomware attack on Perth-based Scope Systems’ Pronto Xi ERP cloud stack disrupted dozens of mining customers, including Northern Star Resources and Evolution Mining, in what MM‑ISAC’s Rob Labbe calls the broadest single third‑party cyber event the sector has seen. Scope says client servers were restored from backups and not directly accessed, but admits internal data was exfiltrated and has not disclosed the attack vector, raising questions about visibility at hypervisor, storage and backup layers. The incident spotlights how multi‑tenant vCenter/ESXi environments, VM cloning and snapshot abuse—already used by groups like Akira—could expose integrated exploration, production and maintenance data across more than 400 Pronto Xi‑reliant mining operations.

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers
    Mining
    1 day ago

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers

    Newmont’s Red Chris mine in British Columbia has secured an amended Environmental Assessment Certificate and Mines Act permit, allowing a shift from open-pit to underground block caving and extending operations into the mid-2040s. The copper-gold porphyry deposit in the Golden Triangle hosts an estimated 20 million oz of gold and 13 billion lb of copper, with the block cave expected to lift Canada’s copper output by about 15%. The project entails several billion dollars in capital, around 1,800 construction jobs and roughly 1,500 operating roles at peak.

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects
    Mining
    1 day ago

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects

    Goldman Sachs has cut its end‑2026 gold price forecast by US$500/oz to US$4,900/oz after the US Federal Reserve, under new chair Kevin Warsh, signalled a hawkish shift that has pushed market-implied December rate hike odds to 87%. Spot gold has already fallen to about US$4,100/oz, down 27% from its near‑US$5,600/oz January peak, with three consecutive monthly losses between March and May and a 4% year‑to‑date decline. Goldman warns a 2026 year‑end target as low as US$4,400/oz is possible if rates rise, partly offset by ongoing central‑bank buying of roughly 50 tonnes/month this year and 40 tonnes/month next year.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy