Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Eriez CavTube at CRU Phosphates+Potash 2026: ultrafines recovery notes for plant engineers

    April 13, 2026|

    Reviewed by Tom Sullivan

    Eriez CavTube at CRU Phosphates+Potash 2026: ultrafines recovery notes for plant engineers

    First reported on International Mining – News

    30 Second Briefing

    Eriez will showcase its CavTube column flotation system at CRU Phosphates+Potash 2026, focusing on recovering ultrafine phosphates and potash from tailings streams to improve overall plant performance and water reuse. Global Product Manager – Column Flotation, Michele Tuchscherer, will present a technical paper on “Sustainable Slimes Beneficiation”, detailing how column flotation can treat slimes fractions that are typically lost to tailings. For process engineers, the pitch centres on higher ultrafines recovery, reduced tailings volumes and more efficient reagent and water utilisation in existing circuits.

    Technical Brief

    • For similar fine-tailings circuits, column flotation can defer new tailings storage construction by improving recovery.

    Our Take

    Eriez appears several times in our mining product coverage, including its 2026 CONEXPO-CON/AGG showcase, signalling a deliberate push to position the company as a full flowsheet solutions vendor rather than just a niche equipment supplier.

    For phosphates and potash operations, column flotation aimed at ultrafines recovery has strategic implications for tailings management and water use, which aligns with the ‘Sustainability’ tag and may help operators defer greenfield expansions by squeezing more value from existing ore streams.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Agnico–Rupert $2.1B Finland hub: production, capex and synergies for mine planners
    Mining
    about 3 hours ago

    Agnico–Rupert $2.1B Finland hub: production, capex and synergies for mine planners

    Agnico Eagle Mines is acquiring Rupert Resources for about C$2.9 billion and, together with deals for Aurion Resources and B2Gold’s 70% stake in the Fingold JV, will control roughly 2,492 sq. km in Finland’s Central Lapland Greenstone Belt. The consolidated hub will link the Kittila mine (3.3 Moz probable reserves) with Rupert’s Ikkari project (3.5 Moz probable reserves), targeting about 500,000 oz/year of gold production within a decade and up to $500 million in operating and development synergies. Agnico plans C$20 million of Ikkari drilling in 18 months and C$60–100 million in regional exploration over three years, with an internal mine evaluation due by end-2027.

    Southern Copper’s $1.8B Tía María reauthorisation: schedule and design notes for mine planners
    Mining
    about 5 hours ago

    Southern Copper’s $1.8B Tía María reauthorisation: schedule and design notes for mine planners

    Peru has reauthorised the mining permit for Southern Copper’s $1.8 billion Tía María project, clearing La Tapada open-pit’s first-stage operations after Minem confirmed compliance on environmental certification, ownership, and safety and health obligations, including previously incomplete waste dump design and project scheduling. The project, in Arequipa, is slated to produce 120,000 tonnes of copper per year for 20 years, with start-up targeted between late 2026 and early 2027, adding to Southern Copper’s Toquepala, Cuajone and Ilo operations. The decision lands amid a chaotic presidential run-off and roughly $7 billion of stalled copper projects linked to illegal mining.

    Mining
    about 6 hours ago

    Assarel-Medet Liebherr R 9350 E: design and haulage notes for mine engineers

    Assarel-Medet has taken delivery of a 300 t class Liebherr R 9350 E electric excavator for its Assarel copper mine at Bul in Bulgaria’s Pazardzhik province, the fifth large electric Liebherr excavator supplied to the company by Liebherr-Export and local partner Alki-L. The R 9350 E, powered by an electric drive rather than diesel, delivers zero on-site greenhouse gas emissions at the face, supporting lower ventilation demand and reduced fuel logistics for the open-pit operation.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy