Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    ERG ‘Year of Digitalisation and AI’: integration lessons for mine engineers

    February 9, 2026|

    Reviewed by Tom Sullivan

    ERG ‘Year of Digitalisation and AI’: integration lessons for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Eurasian Resources Group reports that digital tools and in‑house AI across its mines and plants delivered more than $111 million in economic impact in 2025, as it brands 2026 its “Year of Digitalisation and AI”. The group is expanding site connectivity and core IT infrastructure to support proprietary optimisation models for processing plants and mine operations, rather than relying on off‑the‑shelf platforms. For engineers, this signals growing demand for robust OT networks, data governance, and integration of AI models directly into control systems and dispatch.

    Technical Brief

    • Roll-out hinges on upgraded site fibre and wireless backbones to carry high-frequency OT data.
    • Data integration spans concentrators, smelters and mines, enabling cross-site optimisation rather than siloed plant tuning.
    • Proprietary models are trained on historical process and fleet datasets, avoiding generic vendor parameter sets.
    • Cyber‑security hardening of the new OT/IT interfaces is a stated prerequisite for further AI deployment.
    • AI tools are being extended from processing optimisation into maintenance planning, stockpile management and logistics routing.
    • Several AI applications have already moved from pilot to full-scale operation.
    • For other miners, this approach underlines a shift towards owning algorithms while outsourcing only base infrastructure.

    Our Take

    Among the 944 Mining stories in our database, only a small subset quantify AI outcomes in dollar terms, so Eurasian Resources Group putting a 2025 economic impact figure on digital tools signals a relatively mature internal value-tracking framework.

    For operators watching AI ‘product’ offerings, ERG’s reported 2025 economic impact suggests that off‑the‑shelf solutions are now being tied to hard P&L metrics rather than pilot‑stage KPIs, which will likely raise expectations on vendors in other Projects‑tagged deployments.

    With many AI and artificial intelligence keyword‑matched pieces still focused on exploration or planning, ERG’s emphasis on realised economic impact positions it towards the operations‑side of digitalisation, implying that brownfield optimisation is where near‑term returns are currently most visible.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    TerraLithium and BHE Renewables: geothermal lithium project lens for mine planners
    Mining
    about 5 hours ago

    TerraLithium and BHE Renewables: geothermal lithium project lens for mine planners

    TerraLithium, an Occidental subsidiary, and BHE Renewables have produced lithium chloride from geothermal brines at BHE’s Calipatria geothermal plant in California’s Imperial Valley and converted it to battery-grade lithium carbonate. The partners have also directly converted lithium chloride to lithium hydroxide using a commercial-scale electrolyser at TerraLithium’s Brawley R&D facility in the US’s second-largest geothermal field, validating high-purity output against commercial processing standards. BHE Renewables plans to build, own and operate full-scale lithium production facilities in Imperial County once technical and economic feasibility is proven.

    Ground view Kazakhstan at Qarmet mines: safety, control and data lessons for engineers
    Mining
    about 5 hours ago

    Ground view Kazakhstan at Qarmet mines: safety, control and data lessons for engineers

    Kazakh steel and mining company Qarmet has installed an almost total underground visibility system at its eight former ArcelorMittal coal mines in Karaganda, combining helmet‑mounted cameras with live location tracking of every miner on a central control‑room schematic. Pre‑shift “health booths” at the portal process about 50 workers per hour, checking blood pressure, pulse, eye fatigue and alcohol, with roughly 1% barred from descending, and all footage stored on 1 TB helmet units and uploaded after each shift. The in‑house system, developed by teams of about 30 per mine, is paired with a privately funded medical centre delivering around 200 check‑ups a day, but raises unresolved questions about consent and long‑term use of pervasive surveillance in a company town setting.

    Gladiator–BlackRock Yukon raise: drilling scale-up and project lens for mine planners
    Mining
    about 5 hours ago

    Gladiator–BlackRock Yukon raise: drilling scale-up and project lens for mine planners

    Gladiator Metals has raised over C$35 million in a BlackRock-led private placement, issuing 7 million flow-through shares at C$3.87 and 3 million non-flow-through shares at C$2.65, lifting its treasury to about C$50 million and its market capitalisation to C$357.9 million. The funding fully covers the 2026–2027 drilling campaign at the Whitehorse Copper project in Yukon, targeting multiple high-grade prospects across a 35 x 5 km belt. Cowley Park, with more than 300 historical holes and 700 m of defined copper-molybdenum strike, will see drill capacity doubled from three to six rigs by late summer.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy