Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Cyclone Narelle hits Australia: logistics and safety lessons for mine operators

    March 27, 2026|

    Reviewed by Tom Sullivan

    Cyclone Narelle hits Australia: logistics and safety lessons for mine operators

    First reported on MINING.com

    30 Second Briefing

    Tropical Cyclone Narelle, peaking at category 4 near Exmouth with forecast gusts to 165 km/h and heavy rainfall, has forced port closures at Ashburton, Cape Preston West, Dampier, Varanus Island and Geraldton, disrupting iron ore and LNG export logistics across Western Australia. Rio Tinto suspended port operations while maintaining mining and rail, Mineral Resources halted marine operations at Ashburton under its cyclone plan, and Fenix Resources scaled back non-essential mining and haulage amid diesel shortages linked to Middle East supply constraints. Westgold and Ramelius prepared for significant rainfall around Mount Magnet, with Ramelius planning short-term fuel sourcing from Perth instead of Geraldton.

    Technical Brief

    • Bureau of Meteorology guidance specified sustained winds near 120 km/h and gusts up to 165 km/h.
    • Narelle was downgraded from category 4 offshore Exmouth to category 3 by Friday afternoon, then forecast category 2.
    • Pilbara Ports implemented staged berth clearing at Ashburton, Cape Preston West, Dampier and Varanus Island from Tuesday night.
    • Mineral Resources activated a formal cyclone management plan, including full suspension of marine operations at Port of Ashburton.
    • Fenix Resources explicitly linked operational curtailment to compounded diesel shortages from Middle East conflict and cyclone-related logistics.
    • Ramelius’ Mount Magnet preparations followed a standardised severe weather protocol focused on significant rainfall rather than direct wind impact.
    • Narelle’s four Australian landfalls in one week illustrate multi-region contingency planning needs for fuel, ports and workforce movements.

    Our Take

    Pilbara Ports’ recent record throughputs of 71.2 Mt in December 2025 and 55.9 Mt in February 2026 mean even short cyclone-related closures at Port Hedland and Dampier can quickly translate into noticeable volatility in iron ore export schedules for BHP, Rio Tinto and Fortescue.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    about 7 hours ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners
    Mining
    about 8 hours ago

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners

    Barrick Mining has warned of “significant increases” to the capital budget and schedule for the 50%-owned Reko Diq copper-gold project in Balochistan, where Phase 1 was previously costed at US$5.6–6.0 billion and Phase 2 at US$3.3–3.6 billion, with first production targeted by end-2028. Citing escalating security risks in Pakistan and the wider region, Barrick will slow field development and extend the technical and financing review to mid‑2027, while keeping the project under “active management” with reduced capital spend. The porphyry deposit, holding an estimated 15 million tonnes of copper reserves and modelled for a 37‑year mine life, remains central to Barrick’s Tier 1 copper strategy and its long-term community commitments in Balochistan.

    Orica tech for smaller North American mines: blast design gains for engineers
    Mining
    about 11 hours ago

    Orica tech for smaller North American mines: blast design gains for engineers

    Orica is targeting smaller North American mines and quarries with the same digital blasting toolkit used on large sites, including its BlastIQ cloud platform for blast design and performance tracking and on-bench digital loading systems. Area Business Manager Elliott Giles told IM that these operations, aggregated, form a major explosives volume market, and are now adopting electronic detonators and precise blast modelling to cut oversize and improve fragmentation. For geotechs and drill‑and‑blast engineers, the shift means more consistent burden control, tighter vibration management and better data for pit wall stability assessment even on “small” jobs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy