Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    CSIRO’s sustainable mining push: collaboration takeaways for project engineers

    January 28, 2026|

    Reviewed by Tom Sullivan

    CSIRO’s sustainable mining push: collaboration takeaways for project engineers

    First reported on Australian Mining

    30 Second Briefing

    CSIRO is calling for deeper collaboration between miners, METS companies and researchers to accelerate low‑emissions technologies across exploration, extraction and processing for a clean‑energy minerals supply chain. The agency is pushing joint work on electrified and automated haulage fleets, coarse particle flotation and in‑situ recovery to cut diesel use, water consumption and tailings volumes. For geotechnical and processing teams, the message is to engage earlier with CSIRO-led consortia to pilot site‑specific solutions rather than bolt on generic decarbonisation projects later.

    Technical Brief

    • CSIRO is convening multi-year, multi-partner consortia rather than short, single-company technology trials.
    • Collaboration is explicitly targeting clean-energy minerals such as lithium, nickel, copper and rare earths in Australia.
    • The agency is positioning its minerals value-chain work alongside national hydrogen, energy and circular-economy missions.
    • CSIRO stresses integration of mine planning, processing flowsheets and product specification in early-stage R&D programs.
    • Partnerships are being structured to share IP and de-risk scale-up from lab to full plant deployment.
    • Data-sharing frameworks between miners, METS and CSIRO are being formalised to enable cross-site benchmarking.
    • CSIRO notes that isolated, site-by-site innovation is too slow relative to projected clean-energy metals demand.

    Our Take

    CSIRO’s role in Australia appears across multiple Mining pieces in our database as a bridge between research and operators, suggesting that its push for collaboration is likely to influence how new sustainability standards and tools are actually adopted on projects rather than just developed in labs.

    Among the 1525 Projects/Sustainability-tagged pieces, Australia is one of the most frequently recurring jurisdictions, which signals that collaborative frameworks promoted by CSIRO could become informal benchmarks for ESG practice in other mining regions watching Australian regulation and technology exports.

    With many of the 1229 AI/‘artificial intelligence’-matched items focused on mining efficiency and environmental monitoring, CSIRO’s emphasis on collaboration in Australia is likely to shape how AI pilots move from isolated trials to site-wide systems that can satisfy both productivity and sustainability objectives.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    about 13 hours ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners
    Mining
    about 14 hours ago

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners

    Barrick Mining has warned of “significant increases” to the capital budget and schedule for the 50%-owned Reko Diq copper-gold project in Balochistan, where Phase 1 was previously costed at US$5.6–6.0 billion and Phase 2 at US$3.3–3.6 billion, with first production targeted by end-2028. Citing escalating security risks in Pakistan and the wider region, Barrick will slow field development and extend the technical and financing review to mid‑2027, while keeping the project under “active management” with reduced capital spend. The porphyry deposit, holding an estimated 15 million tonnes of copper reserves and modelled for a 37‑year mine life, remains central to Barrick’s Tier 1 copper strategy and its long-term community commitments in Balochistan.

    Orica tech for smaller North American mines: blast design gains for engineers
    Mining
    about 17 hours ago

    Orica tech for smaller North American mines: blast design gains for engineers

    Orica is targeting smaller North American mines and quarries with the same digital blasting toolkit used on large sites, including its BlastIQ cloud platform for blast design and performance tracking and on-bench digital loading systems. Area Business Manager Elliott Giles told IM that these operations, aggregated, form a major explosives volume market, and are now adopting electronic detonators and precise blast modelling to cut oversize and improve fragmentation. For geotechs and drill‑and‑blast engineers, the shift means more consistent burden control, tighter vibration management and better data for pit wall stability assessment even on “small” jobs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.