Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety
    Product

    Codelco’s Kinamics robot at El Teniente: design and re-entry lessons for engineers

    February 26, 2026|

    Reviewed by Tom Sullivan

    Codelco’s Kinamics robot at El Teniente: design and re-entry lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    Codelco’s El Teniente Division has deployed the Kinamics Arkytas MU-2.1 remote-controlled robot to survey new mining fronts in the Esmeralda mine, operating directly at advancing tunnel faces targeted for a zero-exposure environment. The tracked unit carries cameras and geotechnical sensors into unsupported headings to characterise rock mass conditions and verify excavation profiles before personnel entry. Early use focuses on newly blasted development drives, indicating scope to integrate robotic mapping with drill-and-blast design, ground support selection and re-entry protocols in high-risk zones.

    Technical Brief

    • Use in Esmeralda forms part of Codelco El Teniente’s “zero-exposure mine” safety drive for new developments.

    Our Take

    Across recent coverage, Codelco’s Chilean copper operations feature heavily in digital and automation stories, from the Schneider Electric MoU on digital transformation to this Kinamics deployment at El Teniente, signalling a coordinated push to modernise both fixed plants and underground fronts.

    Pairing robotic surveying at El Teniente with the long-life extension work at Ministro Hales suggests Codelco is using technology to de-risk geotechnical and operational uncertainty as it commits to multi-decade copper production horizons in Chile.

    For Kinamics, getting a safety- and product-tagged deployment inside Codelco’s flagship underground copper division positions the company well for replication across other deep, complex mines in our database, where remote front mapping is becoming a key differentiator in tendering for development work.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers
    Mining
    about 8 hours ago

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    Brightstar Resources has reported its largest Sandstone result at the Two Mile Hill deposit in WA, intersecting 305m at 2.66g/t gold from 503m depth in diamond hole TMHDD26005. The interval contains multiple high-grade zones, including 4.1m at 26.1g/t, 5.5m at 25.2g/t and 4m at higher-grade material within the broader mineralised envelope. The scale and continuity of this intercept materially upgrade the grade-times-width profile of Two Mile Hill, supporting potential for bulk underground mining scenarios and further deep drilling.

    BHP record WA community spend: procurement signals for mining contractors
    Mining
    about 8 hours ago

    BHP record WA community spend: procurement signals for mining contractors

    BHP has reported a record $1.1 billion in community expenditure across Western Australia for FY2026, including $627 million in procurement from Indigenous and Traditional Owner businesses. The miner’s 2026 Western Australia Community Development Report also details more than $850 million in payments to local suppliers, councils and community partners, signalling a heavy regional spend alongside its iron ore and nickel operations. For contractors and service providers, the scale of Indigenous and local sourcing points to strong demand for WA-based capability and joint ventures.

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers
    Mining
    about 8 hours ago

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers

    AIC Mines has closed a $70 million acquisition of Materra Metals, securing 100 per cent ownership of the Mt Cuthbert copper project in north‑west Queensland and adding 18.7 million tonnes of copper resources to its portfolio. The company plans a major drilling program in 2027, signalling a shift from resource consolidation to definition drilling and potential mine planning at Mt Cuthbert. For geotechnical and mine planners, the deal points to upcoming demand for pit design, hydrogeology, and infrastructure studies in a historically underdeveloped copper district.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental