Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Safety
    Product

    Codelco’s Kinamics robot at El Teniente: design and re-entry lessons for engineers

    February 25, 2026|

    Reviewed by Tom Sullivan

    Codelco’s Kinamics robot at El Teniente: design and re-entry lessons for engineers

    First reported on International Mining – News

    30 Second Briefing

    Codelco’s El Teniente Division has deployed the Kinamics Arkytas MU-2.1 remote-controlled robot to survey new mining fronts in the Esmeralda mine, operating directly at advancing tunnel faces targeted for a zero-exposure environment. The tracked unit carries cameras and geotechnical sensors into unsupported headings to characterise rock mass conditions and verify excavation profiles before personnel entry. Early use focuses on newly blasted development drives, indicating scope to integrate robotic mapping with drill-and-blast design, ground support selection and re-entry protocols in high-risk zones.

    Technical Brief

    • Use in Esmeralda forms part of Codelco El Teniente’s “zero-exposure mine” safety drive for new developments.

    Our Take

    Across recent coverage, Codelco’s Chilean copper operations feature heavily in digital and automation stories, from the Schneider Electric MoU on digital transformation to this Kinamics deployment at El Teniente, signalling a coordinated push to modernise both fixed plants and underground fronts.

    Pairing robotic surveying at El Teniente with the long-life extension work at Ministro Hales suggests Codelco is using technology to de-risk geotechnical and operational uncertainty as it commits to multi-decade copper production horizons in Chile.

    For Kinamics, getting a safety- and product-tagged deployment inside Codelco’s flagship underground copper division positions the company well for replication across other deep, complex mines in our database, where remote front mapping is becoming a key differentiator in tendering for development work.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    King’s Japan visit: fuel security and critical minerals lens for project teams
    Mining
    about 12 hours ago

    King’s Japan visit: fuel security and critical minerals lens for project teams

    Fuel security concerns will dominate Federal Resources Minister Madeleine King’s visit to Japan this weekend, with talks expected to focus on diesel and LNG supply chains and Australia’s role as a long-term energy exporter. King is also set to discuss Japanese investment in Australian critical minerals projects, including lithium, nickel and rare earths, amid pressure to diversify away from single-country processing hubs. Outcomes could influence future offtake agreements, funding for new mines and refineries, and infrastructure for secure fuel storage and shipping routes.

    Gold and silver price weakness: planning implications for mine project teams
    Mining
    about 20 hours ago

    Gold and silver price weakness: planning implications for mine project teams

    Gold slipped below $5,100/oz on Friday, touching about $5,020 and heading for a second straight weekly loss as the Middle East war drives up oil and gas prices and keeps interest rate cut expectations low. The metal has traded in a tight $5,000–$5,200/oz range since an early-month spike after the US-Israeli strike on Iran, and is now almost 9% off its late-January record near $5,600/oz, though still 17% higher year-to-date. Silver fell almost 5% to just above $80/oz, with only a 10% gain so far in 2026.

    Rio Tinto’s Nemaska lithium plant slowdown: schedule and feed risks for mine planners
    Mining
    about 21 hours ago

    Rio Tinto’s Nemaska lithium plant slowdown: schedule and feed risks for mine planners

    Rio Tinto is slowing construction of the Nemaska lithium hydroxide conversion plant at Bécancour, Quebec, cutting its contractual workforce by about 50% while keeping several hundred workers on site, but still targets commissioning this decade and first production in 2028. The plant is roughly 70% complete, designed for 32,000 tonnes per year of lithium hydroxide, with Rio planning US$300 million of investment alongside a C$200 million commitment from the Quebec government, which retains 46.1%. Nemaska’s integrated project is based on a 26‑year Whabouchi open‑pit/underground mine producing 200,000 tonnes of spodumene concentrate annually, though Rio is reassessing feed against its Galaxy hard rock project, with a decision due in H2 2026.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.