Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Codelco–Microsoft mining AI deal: asset, process and OT impacts for engineers

    March 6, 2026|

    Reviewed by Joe Ashwell

    Codelco–Microsoft mining AI deal: asset, process and OT impacts for engineers

    First reported on International Mining – News

    30 Second Briefing

    Codelco has signed a collaboration framework with Microsoft to evaluate joint initiatives in artificial intelligence, advanced analytics, automation and digital security as part of its digital transformation strategy. The agreement, signed by Codelco CEO Rubén Alvarado and Microsoft President Brad Smith, will focus on applying cloud-based analytics and AI tools across mine planning, processing and asset management. For engineers, the deal signals more data-driven optimisation of concentrators and smelters, tighter cybersecurity around OT networks, and potential expansion of predictive maintenance on critical mobile and fixed plant.

    Technical Brief

    • Agreement is structured as a framework to evaluate multiple joint initiatives rather than a single project.

    Our Take

    In our database, Codelco’s 18‑month MoU with Microsoft on AI and analytics sits alongside its separate MoU with Rio Tinto on major mining development, signalling that Codelco is pairing digital modernisation with parallel moves to secure future growth projects and critical minerals exposure.

    Recent coverage of Codelco’s El Teniente deployment of the Kinamics Arkytas MU‑2.1 robot suggests that the Microsoft collaboration is likely to plug into an already active automation and remote‑operations pipeline rather than starting from a greenfield digital baseline.

    Among the 1125 Mining stories in our database, relatively few combine AI/analytics with explicit Safety tagging, so this Codelco–Microsoft agreement is notable as one of the clearer examples where large‑scale digital roll‑outs are framed as a safety as well as productivity lever.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hercules hires Hudbay deal team: Leviathan copper project lens for engineers
    Mining
    2 days ago

    Hercules hires Hudbay deal team: Leviathan copper project lens for engineers

    Hercules Metals has hired former Arizona Sonoran Copper CEO George Ogilvie and six ex-colleagues who led the Cactus project to a US$1.4 billion sale to Hudbay, tasking them with advancing the Leviathan porphyry copper discovery in Idaho. Leviathan’s system has been drilled over more than 1 km strike, up to 750 m width and 500 m vertical extent, with discovery hole HER-23-05 returning 185 m at 0.84% Cu including 45 m at 1.94% Cu, beneath an epithermal silver system. Barrick-backed Hercules controls 404.7 sq. km along a 73-km copper belt with surface mining rights, road access and three 260 kV transmission lines crossing the property, but no resource or economic study yet, giving the new team a blank technical slate.

    Equinox appoints Orla’s Simpson as CEO: capex and integration lens for mine planners
    Mining
    2 days ago

    Equinox appoints Orla’s Simpson as CEO: capex and integration lens for mine planners

    Equinox Gold will install Orla Mining’s Jason Simpson as CEO on 1 November, accelerating a leadership change just days after closing their C$25.4 billion all-share merger to form a six-mine producer targeting 1.1 million oz. of gold per year. The enlarged portfolio includes Greenstone, Valentine and Musselwhite in Canada, forecast to deliver 685,000 oz. annually, with further growth tied to South Railroad, Castle Mountain, Los Filos and an underground build at Camino Rojo. Simpson must quickly prioritise capex and integration as Greenstone and Valentine ramp up and Equinox prepares consolidated guidance.

    Mining
    2 days ago

    AECI Mining in Namibia: water stewardship design notes for mine planners

    Namibia’s expanding uranium, gold and copper sector is drawing new investment, and AECI Mining argues that project success will hinge on how efficiently operations manage scarce water and other natural resources. The company promotes integrated blasting, reagent and water-treatment packages tailored to arid conditions, linking emulsion explosives, process chemicals and closed-loop water circuits to cut freshwater intake and improve plant stability. For mine planners and process engineers, the message is to embed water stewardship into early pit design, tailings strategies and plant selection rather than bolt-on compliance later.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy