Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Cobalt Blue–Glomar Minerals JV: process design and capex lens for US cobalt

    March 31, 2026|

    Reviewed by Joe Ashwell

    Cobalt Blue–Glomar Minerals JV: process design and capex lens for US cobalt

    First reported on Australian Mining

    30 Second Briefing

    Cobalt Blue has signed a consortium agreement with US-based Glomar Minerals to deploy its Australian-developed cobalt processing technology in the United States, targeting domestic production of battery-grade cobalt sulphate. The partnership centres on applying Cobalt Blue’s proprietary sulphide-to-sulphate flowsheet, originally engineered for Broken Hill-style deposits, to US feedstocks to reduce reliance on imported intermediates. For process and project engineers, the move signals potential demand for new hydrometallurgical plants, tailings handling systems and permitting work around cobalt-bearing ore bodies in the US.

    Technical Brief

    • Similar cross-border technology consortia could de-risk metallurgical scale-up for other critical minerals (e.g. nickel, manganese).

    Our Take

    Cobalt-related items are relatively sparse in our mining database compared with lithium and copper, so a JV-led US push involving Cobalt Blue signals that downstream users are still looking to diversify cobalt supply chains beyond the DRC and Indonesia.

    Australian–US combinations in project and contract-award stories have tended to focus on technology transfer rather than pure equity investment, suggesting this JV may be more about deploying Australian processing know‑how in the US than shifting large volumes of ore from Australia.

    For a mid-tier player like Cobalt Blue, JV structures into the United States typically provide leverage into US federal incentives for critical minerals, which can materially de-risk project financing compared with staying solely in Australian jurisdictions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    about 5 hours ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    about 18 hours ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners
    Mining
    about 19 hours ago

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners

    Barrick Mining has warned of “significant increases” to the capital budget and schedule for the 50%-owned Reko Diq copper-gold project in Balochistan, where Phase 1 was previously costed at US$5.6–6.0 billion and Phase 2 at US$3.3–3.6 billion, with first production targeted by end-2028. Citing escalating security risks in Pakistan and the wider region, Barrick will slow field development and extend the technical and financing review to mid‑2027, while keeping the project under “active management” with reduced capital spend. The porphyry deposit, holding an estimated 15 million tonnes of copper reserves and modelled for a 37‑year mine life, remains central to Barrick’s Tier 1 copper strategy and its long-term community commitments in Balochistan.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.