Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Bulk26 Melbourne: conveyor monitoring and guarding takeaways for engineers

    March 30, 2026|

    Reviewed by Joe Ashwell

    Bulk26 Melbourne: conveyor monitoring and guarding takeaways for engineers

    First reported on Australian Mining

    30 Second Briefing

    BULK26 in Melbourne on 10–11 April will focus on predictive conveyor monitoring, next-generation transfer point guarding and dust control technologies across ports, terminals, stockyards and mine load‑out facilities. Exhibitors and speakers will cover condition‑based maintenance for high‑tonnage conveyor systems, advanced chute and liner designs to reduce impact wear, and engineered guarding solutions that maintain AS/NZS compliance while improving access. For plant, maintenance and materials‑handling engineers, the event offers direct exposure to vendors and case studies targeting common bottlenecks such as spillage, belt misalignment and unplanned conveyor downtime.

    Technical Brief

    • Sessions are structured around operational “pain points” rather than product categories, encouraging failure‑driven discussion.
    • Format combines supplier case studies with end‑user panels from ports, terminals and mine load‑out plants.
    • Exhibitor mix targets whole conveyor streams: drives, idlers, chutes, dust systems, guarding and monitoring hardware.
    • Operators can benchmark OEM offerings side‑by‑side for retrofit versus greenfield conveyor upgrade strategies.
    • Discussion is framed around Australian regulatory settings, including AS/NZS compliance and site access constraints.
    • Event design encourages cross‑site comparison of maintenance regimes and shutdown planning for bulk handling assets.
    • For other bulk materials hubs, the model offers a template for issue‑focused, multi‑disciplinary conveyor forums.

    Our Take

    Prime Creative Media and Australian Mining are using events like Bulk26 alongside the WA Mining Conference and PNG Expo to build a contiguous calendar of materials handling and project-focused forums across Australia and PNG, which tends to help OEMs and contractors plan product launches and trials around show dates.

    Within our mining-projects coverage, Australia stands out as the main hub where product-focused expos (such as Bulk26 and WA Mining) are explicitly tied to brownfield optimisation rather than only greenfield promotion, signalling that operators are looking to retrofit new handling solutions into existing bulk operations.

    The same organiser pairing behind Bulk26 is also promoting decarbonised heavy mobile equipment in Australia through coverage of XCMG’s battery-electric fleets, suggesting that bulk handling themes at Bulk26 are likely to intersect with low-emission haulage and loading options rather than conventional diesel-only systems.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    about 13 hours ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners
    Mining
    about 14 hours ago

    Barrick’s Reko Diq copper project delays: capex and schedule lens for mine planners

    Barrick Mining has warned of “significant increases” to the capital budget and schedule for the 50%-owned Reko Diq copper-gold project in Balochistan, where Phase 1 was previously costed at US$5.6–6.0 billion and Phase 2 at US$3.3–3.6 billion, with first production targeted by end-2028. Citing escalating security risks in Pakistan and the wider region, Barrick will slow field development and extend the technical and financing review to mid‑2027, while keeping the project under “active management” with reduced capital spend. The porphyry deposit, holding an estimated 15 million tonnes of copper reserves and modelled for a 37‑year mine life, remains central to Barrick’s Tier 1 copper strategy and its long-term community commitments in Balochistan.

    Orica tech for smaller North American mines: blast design gains for engineers
    Mining
    about 17 hours ago

    Orica tech for smaller North American mines: blast design gains for engineers

    Orica is targeting smaller North American mines and quarries with the same digital blasting toolkit used on large sites, including its BlastIQ cloud platform for blast design and performance tracking and on-bench digital loading systems. Area Business Manager Elliott Giles told IM that these operations, aggregated, form a major explosives volume market, and are now adopting electronic detonators and precise blast modelling to cut oversize and improve fragmentation. For geotechs and drill‑and‑blast engineers, the shift means more consistent burden control, tighter vibration management and better data for pit wall stability assessment even on “small” jobs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.