Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability
    Product

    Airbridge WA carbon capture grant: Pilbara deployment lens for mine engineers

    December 18, 2025|

    Reviewed by Tom Sullivan

    Airbridge WA carbon capture grant: Pilbara deployment lens for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Airbridge has secured the maximum A$1.5 million grant under Western Australia’s Carbon Innovation Grants Program Round 2, run by the Department of Water and Environmental Regulation, to expand its carbon capture and utilisation technology. The funding will support scaling from an operational pilot plant in Perth into heavy industrial applications in the Pilbara, targeting large mining and processing emitters. For miners, this signals near-term opportunities to trial point-source capture and CO₂ utilisation on existing fixed plant rather than only at new-build facilities.

    Technical Brief

    • Grant amount is the programme maximum, A$1.5 million, indicating top-tier assessment against WA criteria.
    • Funding comes via WA’s Carbon Innovation Grants Program Round 2, administered by the Department of Water and Environmental Regulation.
    • Airbridge’s existing plant is already operating at pilot scale in Perth, not just bench or lab.
    • Scale-up is explicitly targeted at heavy industrial loads typical of Pilbara mining and processing facilities.
    • Carbon capture is paired with utilisation, implying downstream conversion or product pathways rather than pure storage.

    Our Take

    Western Australia features heavily in our Mining coverage, and state-backed financing like this grant tends to de‑risk early-stage decarbonisation technologies, making it easier for Pilbara iron ore and lithium operators to pilot third‑party solutions without tying up their own capital budgets.

    The Department of Water and Environmental Regulation’s role signals that any Airbridge deployment in the Pilbara will likely have to demonstrate not just CO₂ reduction but also minimal impact on scarce water resources, a recurring constraint in WA project approvals in our database.

    With up to A$1.5 million available per project under this Carbon Innovation Grants round, Airbridge is positioned to move from lab or small pilot work in Perth towards site‑integrated demonstrations in the Pilbara, which is often the tipping point at which miners start to consider offtake-style or service‑fee contracts for new carbon technologies.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Tapojärvi at Sotkamo Silver mine: continuity and risk notes for production engineers

    Tapojärvi has restarted as main mining contractor at Sotkamo Silver’s underground silver mine in Finland, resuming a role it previously held from 2018 to 2023 under a new agreement signed in June 2025. The contract covers full-scale production mining services, including drilling, blasting, loading and haulage in a familiar orebody and infrastructure, allowing rapid ramp-up using existing site knowledge and established operating procedures. For geotechnical and production engineers, continuity in contractor, ground control methods and equipment fleet should reduce interface risk and support stable output planning.

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers
    Mining
    about 24 hours ago

    STRACON’s Los Bronces tailings dam contract: lifecycle model insights for engineers

    STRACON has secured an integrated engineering, construction, financing and long-term operations and maintenance contract for the Pérez Caldera Tailings Dam at Anglo American Sur’s Los Bronces copper operation in Chile’s Lo Barnechea district. The scope combines dam design and build with funding and multi-year O&M, signalling a bundled delivery model for critical tailings infrastructure rather than separate EPC and operator contracts. For geotechnical and tailings engineers, this points to growing demand for contractors capable of lifecycle stewardship under Chile’s stringent post-Brumadinho regulatory environment.

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers
    Mining
    2 days ago

    Metso’s third orders for Almalyk copper smelter: design and ramp-up notes for engineers

    Metso has booked the third tranche of orders for JSC Almalyk Mining and Metallurgical Complex’s copper smelter project in Uzbekistan, following equipment and project services contracts announced on 9 August 2024. The first two tranches, totalling €146 million, were booked in Q4 2024, with the latest booking covering additional core process equipment and associated services for the greenfield smelter complex. The staged order intake signals a multi-phase build-out where process design, commissioning support and long-lead items will be critical for throughput, energy performance and sulphur capture compliance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.