Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Research
    Sustainability

    3D-printed substation foundations: design and testing insights for engineers

    January 7, 2026|

    Reviewed by Tom Sullivan

    3D-printed substation foundations: design and testing insights for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    3D‑printed foundations for electricity substations have completed UK laboratory and on‑site validation, with load tests showing performance above design expectations for bearing capacity and stiffness. The trial, led by National Grid and partners using large‑format concrete 3D printers, compared printed units against conventional reinforced concrete pads under full‑scale vertical and uplift loading. Results indicate potential reductions in concrete volume, programme time and on‑site formwork, with implications for rapid substation upgrades on constrained brownfield sites and softer ground conditions.

    Technical Brief

    • Outcomes inform future design of modular, pre-printed substation foundations for rapid brownfield asset replacement and uprating.

    Our Take

    Among the 366 Infrastructure stories in our database, only a small subset deal with structural 3D printing in the United Kingdom, so substation foundations moving beyond trial scale signals that utilities are starting to treat additive manufacturing as a deployable civil solution rather than a lab curiosity.

    For UK grid operators, 3D-printed foundations that outperform design expectations could materially cut programme time and on-site labour for substation upgrades, which is increasingly important as decarbonisation and electrification projects stack up against limited skilled groundworks capacity.

    Within the 984 tag-matched pieces on Projects, Research and Sustainability, most UK sustainability coverage focuses on materials (low-carbon concrete, recycled aggregates) rather than construction methods, so this work points to process innovation—how assets are built—becoming as significant as material substitution in reducing whole-life impacts.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 7 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Xihe on Tung Chung Line down-track: TBM turnback method and risks for tunnel engineers
    Infrastructure
    in 5 months

    Xihe on Tung Chung Line down-track: TBM turnback method and risks for tunnel engineers

    TBM Xihe, a 7.3m-diameter, 100m-long, 1,000-tonne Herrenknecht slurry machine, has completed the up-track drive to the future Tung Chung West Station and has begun boring the down-track tunnel towards Tung Chung Station for MTR’s Tung Chung Line Extension in Hong Kong. The Bouygues Travaux Publics–Dragages Hong Kong JV turned the TBM underground within the launch shaft using a push-pull method and self-propelled modular transporter, avoiding full disassembly and surface transport. About 1.3km of new twin-bore tunnels are being driven close to existing rail and urban structures, with commissioning targeted for 2029.

    Sydney Metro Stations Package West: design and delivery notes for engineers
    Infrastructure
    in 4 months

    Sydney Metro Stations Package West: design and delivery notes for engineers

    Gamuda Engineering has secured the Sydney Metro Stations Package West as principal contractor, covering design and construction of five new underground stations at Westmead, North Strathfield, Burwood North, Five Dock and The Bays on the 24km Sydney Metro West line between Greater Parramatta and the CBD. The scope includes deep station boxes, entrances and access points, full station fit-out and integration with surrounding precincts, with Laing O’Rourke and DT Infrastructure joining as MetroVista delivery partners. Site works are scheduled to start on Monday, 5 January 2026.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.