Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    HSS ProService digital hire pivot: key implications for project teams and asset planning
    Infrastructure
    10 months ago

    HSS ProService digital hire pivot: key implications for project teams and asset planning

    HSS has divested all 39 branches and 65 merchant outlets to private equity firm Endless for £26m and is renaming itself HSS ProService Building Services Marketplace plc, operating an asset-light, fully digital platform built on its “Brenda” technology. Under a five-year supply deal, Speedy Hire becomes ProService’s principal equipment provider, expects £50m–£55m annual revenue from the arrangement, acquires selected HSS assets for £35m and takes a 9.99% equity stake, with 400 staff moving between the two firms. ProService now aggregates more than 900 suppliers and 50,000 product lines, extending beyond small tools into building materials, bulk fuel and training.

    Salford Grab Hire £10k fine: maintenance safety lessons for plant engineers
    Hazards
    10 months ago

    Salford Grab Hire £10k fine: maintenance safety lessons for plant engineers

    A Manchester-based grab hire firm, Salford Grab Hire Limited, has been fined £10,000 plus £3,475.90 costs after a one-tonne excavator bucket, used to prop a raised tipper truck body during repair, became dislodged and crushed a mechanic in October 2023. The worker sustained multiple fractures to his hand, shoulder blade, ribs, shin and thigh, a crushed ankle and foot, and a pulmonary blood clot. HSE found the bucket lacked a quick hitch or retaining pin and that no appropriate tipper body support equipment or safe system of work had been used.

    Cleaning up in Ukraine: reconstruction pipeline insights for UK project teams
    Infrastructure
    10 months ago

    Cleaning up in Ukraine: reconstruction pipeline insights for UK project teams

    Ukraine is planning what could be Europe’s largest reconstruction programme in decades, with Kyiv signalling “hundreds of billions of pounds” of infrastructure, housing and energy projects once conditions allow large-scale rebuilding. The government is actively courting UK contractors for major road, bridge, rail and utilities packages but reports that most British firms remain hesitant, citing security risk, unclear procurement pipelines and war insurance constraints. For civil and geotechnical specialists, early engagement on damage assessment, resilient design standards and financing structures could shape access to the first wave of high-value contracts.

    Global Crane’s fourth 700-tonner: lift planning notes for wind and civils engineers
    Infrastructure
    10 months ago

    Global Crane’s fourth 700-tonner: lift planning notes for wind and civils engineers

    Global Crane Services has taken delivery of its fourth Liebherr LTM 1650-8.1, an eight-axle, 700-tonne telescopic crane with boom options from 54 to 80 metres, a 90-metre luffing jib and Y-guying giving a 152-metre hook height and 112-metre working radius. Based at Aberdeen, the unit will support heavy lifts for Global Wind Projects and civils, port and offshore work, with operators trained by Liebherr Great Britain. The company now runs more than 70 cranes and has ordered two 250-tonne LTM 1250-5.1s for delivery later this year.

    Octavius £112m Walsgrave junction upgrade: design and phasing notes for engineers
    Infrastructure
    10 months ago

    Octavius £112m Walsgrave junction upgrade: design and phasing notes for engineers

    Planning consent via a development consent order has been granted for the A46 Walsgrave junction upgrade on Coventry’s outskirts, a scheme previously costed at £112m and classed as a nationally significant infrastructure project on the Trans-Midlands Trade Corridor between the M5 and Humber ports. The project will replace the existing three-arm priority roundabout linking the A46 and B4082 with a free-flowing A46 mainline while maintaining local access, targeting reduced delays for around 57,000 daily users. National Highways and main contractor Octavius Infrastructure will now finalise design and updated costs, with construction due to start in autumn 2026 and opening in 2028.

    PMI: UK construction downturn eases, but cost pressures – key signals for project teams
    Infrastructure
    10 months ago

    PMI: UK construction downturn eases, but cost pressures – key signals for project teams

    UK construction output remained in contraction in January but the S&P Global PMI rose to 46.4 from December’s 40.1, with commercial work at 48.4 close to stabilising while housebuilding and civil engineering lagged at 39.3 and 40.6 respectively. Input cost inflation accelerated to its fastest since September 2025 as suppliers passed on higher raw material and wage costs and subcontractor charges increased, squeezing margins and extending job losses to a 13th month. Order books remain fragile, but survey data show improving public sector work, stronger commercial enquiries for 2026 and contractors’ order books in London nearing capacity.

    OpenGround lab workflow update: data, QA and reporting lens for geoengineers
    Software
    10 months ago

    OpenGround lab workflow update: data, QA and reporting lens for geoengineers

    OpenGround has added integrated geotechnical laboratory testing and reporting, bringing raw lab data entry, automated calculations and approval workflows into the same cloud environment as site investigation data. The release supports direct capture of test results (for example Atterberg limits, triaxial and consolidation data) with automatic population of standardised lab report formats and project databases. For practitioners, this reduces manual spreadsheet handling, simplifies traceability from borehole to design parameters, and enables multi-office teams and external labs to work on a single controlled dataset.

    Sandvik’s €15m Tampere expansion: R&D and testing implications for mine engineers
    Mining
    10 months ago

    Sandvik’s €15m Tampere expansion: R&D and testing implications for mine engineers

    Sandvik will invest about €15 million in extending the main building at its Tampere, Finland, site to support operational development, competitiveness and future growth in its rock drilling and crushing equipment business. The project will create multi-purpose work and development spaces, consolidating R&D, prototyping and manufacturing functions that currently sit in separate facilities. For mining clients, a larger integrated Tampere hub should accelerate product development cycles and testing of new underground and surface drilling systems under Nordic hard-rock conditions.

    2026 global construction cost rise: delivery risk takeaways for project teams
    Infrastructure
    10 months ago

    2026 global construction cost rise: delivery risk takeaways for project teams

    Global construction costs are forecast to rise about 2.4% in 2026, with analysts pointing to pressure from labour availability, supply chain fragility, energy prices and geopolitical instability. Even a modest cost uplift at this level can erode contingencies on large infrastructure schemes, particularly those with fixed-price EPC contracts or long-lead materials such as structural steel and specialist M&E systems. Contractors and clients may need tighter risk allowances, more flexible procurement, and scenario-based programming to protect delivery on complex civils and geotechnical works.

    Nista-led Transport and Infrastructure Campus: delivery impacts for project engineers
    Infrastructure
    10 months ago

    Nista-led Transport and Infrastructure Campus: delivery impacts for project engineers

    A new Nista-led Transport and Infrastructure Campus in the West Midlands will co-locate Department for Transport, Ministry of Housing, Communities and Local Government, and Cabinet Office teams to accelerate project delivery. The hub will integrate transport, property and infrastructure specialists to streamline approvals and programme management for major schemes across the region. For civil and geotechnical consultants, this signals a push for earlier multi-disciplinary input, tighter design–construction interfaces and potentially shorter decision cycles on rail, road and urban regeneration projects.

    UK framework for advanced nuclear reactors: design and risk notes for engineers
    Infrastructure
    10 months ago

    UK framework for advanced nuclear reactors: design and risk notes for engineers

    The UK Government has launched a new framework to speed up delivery of advanced nuclear reactors, aiming to cut project timelines and draw in private capital for next‑generation plants such as small modular reactors. The framework is expected to streamline planning and licensing processes with clearer milestones for developers and regulators, and to support early-stage design work and site assessment. Civil and geotechnical engineers should anticipate earlier engagement on nuclear‑grade foundations, seismic qualification and long‑term cooling water and grid connection infrastructure.

    A96 dualling in phases: design, safety and traffic staging notes for engineers
    Infrastructure
    10 months ago

    A96 dualling in phases: design, safety and traffic staging notes for engineers

    The Scottish Government has restated its plan to fully dual the A96 trunk road between Inverness and Aberdeen but will deliver the upgrade in phases due to current budget constraints. The 160km corridor, a key link for HGVs and regional freight, is expected to see staged design and construction packages rather than a single continuous programme. Phasing will affect timing of junction upgrades, overtaking provision and safety improvements, which will be critical for designers planning earthworks, structures and drainage around existing live traffic.

    Welsh Government water governance reforms: key implications for engineers
    Policy
    10 months ago

    Welsh Government water governance reforms: key implications for engineers

    Welsh Government has issued a green paper proposing “once‑in‑a‑generation” reforms to water governance in Wales, signalling potential structural changes to how water resources, wastewater and flood risk are regulated and managed. The proposals could reshape the roles of Welsh Water (Dŵr Cymru), Natural Resources Wales and local authorities in asset planning, abstraction control and river basin management. Civil and water engineers should expect future shifts in consenting, resilience standards and long‑term investment planning for treatment works, drainage networks and flood defences.

    NIE Networks £83M civils framework: scope and delivery notes for project teams
    Infrastructure
    10 months ago

    NIE Networks £83M civils framework: scope and delivery notes for project teams

    Northern Ireland Electricity (NIE) Networks has launched procurement for an £83M multi-year civil engineering framework to support upgrades and new builds across its electricity distribution and transmission assets. The framework is expected to cover substation platforms, cable trenching, ducting, foundations and associated earthworks for overhead lines and underground cables across Northern Ireland. Contractors will need capability for large-volume excavation, backfilling and concrete works in live network environments, with programmes likely driven by grid reinforcement for renewables connections and resilience improvements.

    Spittal–Peterhead 203km HVDC link: geotechnical design notes for engineers
    Infrastructure
    10 months ago

    Spittal–Peterhead 203km HVDC link: geotechnical design notes for engineers

    SSEN Transmission has begun onshore and nearshore construction for its 203km Spittal to Peterhead subsea HVDC link, designed to export renewable power from Caithness to Aberdeenshire. The scheme involves landfall works, transition joint bays and onshore cable sections tying into converter stations at each end, enabling bulk transfer of offshore wind output into the Scottish transmission network. Marine installation of the HVDC cable will demand detailed seabed surveys, burial design and protection measures to manage geotechnical risk along the North Sea route.

    Pension sector call for objections charge: planning reform lens for project teams
    Policy
    10 months ago

    Pension sector call for objections charge: planning reform lens for project teams

    A major UK pensions firm is urging government to reform planning rules so housing, energy and water infrastructure can be delivered faster and provide a more “investable” long‑term pipeline. Proposals include charging objectors to lodge planning objections, tightening time limits on judicial review, and reducing scope for repeat challenges by small activist or single‑issue groups. For engineers, the changes would aim to cut multi‑year delays on nationally significant infrastructure projects, improving programme certainty and financing conditions for large capital schemes.

    XCMG–Fortescue ‘real zero’ fleet: haulage design implications for mine engineers
    Mining
    10 months ago

    XCMG–Fortescue ‘real zero’ fleet: haulage design implications for mine engineers

    XCMG Group and Fortescue have unveiled early prototypes of “real zero” mining fleet equipment, signalling progress towards fully decarbonised haulage and ancillary machinery across Fortescue’s iron ore operations. The collaboration is targeting battery-electric and potentially hydrogen-powered platforms sized for ultra-class haul trucks and large loaders, aiming to integrate with existing pit infrastructure and high-capacity charging or refuelling systems. For mine planners and engineers, the move points to future requirements for redesigned haul profiles, power distribution, and maintenance regimes tailored to zero-emission drivetrains.

    Tivan’s Speewah fluorite resource: design and logistics notes for mine planners
    Mining
    10 months ago

    Tivan’s Speewah fluorite resource: design and logistics notes for mine planners

    Tivan Limited has upgraded the mineral resource estimate for its Speewah fluorite project in Western Australia’s Kimberley region, describing the deposit as “globally significant” and strategically important for fluorine-based chemicals and aluminium production. The Speewah project, already known for its vanadium-titanium-iron mineralisation, now gains added value from a large, higher-confidence fluorite inventory within the existing mining lease. For geotechnical and mine planners, the combined polymetallic resource raises the stakes for integrated pit design, processing flowsheets and long-term infrastructure planning in a remote, high-cost logistics environment.

    Antipa’s Fiama lode discovery: design and pit optimisation notes for mine planners
    Mining
    10 months ago

    Antipa’s Fiama lode discovery: design and pit optimisation notes for mine planners

    Antipa Minerals has reported a major discovery at its Minyari gold–copper project in Western Australia, with drilling at the newly defined Fiama lode returning multiple high‑grade gold intercepts. The lode sits within the Paterson Province, where existing deposits such as Minyari and WACA already host significant near‑surface sulphide mineralisation amenable to open‑pit and potential underground development. The discovery points to further resource growth potential around existing infrastructure, with implications for pit shell optimisation, underground access design and future processing plant sizing.

    WA vanadium royalty cap: project cost certainty explained for engineers
    Policy
    10 months ago

    WA vanadium royalty cap: project cost certainty explained for engineers

    Western Australia has moved to cap the royalty rate for vanadium products at 5 per cent of the realised value, giving long-term fiscal certainty to developers in a state that hosts the world’s largest share of economic demonstrated vanadium resources. The decision is aimed at projects such as the Australian Vanadium Project near Meekatharra and Technology Metals Australia’s Murchison Technology Metals Project, both targeting vanadium pentoxide for steel alloys and grid-scale vanadium redox flow batteries. For geotechnical and civil teams, the clearer cost base may accelerate approvals, detailed design and construction scheduling for associated open pits, tailings storage and processing plants.

    Sunrise US critical minerals reserve bid: offtake and HPAL notes for engineers
    Mining
    10 months ago

    Sunrise US critical minerals reserve bid: offtake and HPAL notes for engineers

    Sunrise Energy Metals is positioning its Sunrise nickel–cobalt–scandium project in New South Wales to supply the newly announced US strategic critical minerals reserve, targeting long-term offtake into the American defence and clean energy supply chain. The laterite project is designed around high-pressure acid leach (HPAL) processing of nickel and cobalt, with scandium oxide as a key by-product for high-strength aluminium alloys in aerospace and automotive applications. Any US reserve participation would likely require binding offtake contracts, compliance with US sourcing rules, and investment in export logistics from eastern Australia.

    Momentum Technologies dual-track US REE processing: design and scale-up notes for engineers
    Mining
    10 months ago

    Momentum Technologies dual-track US REE processing: design and scale-up notes for engineers

    Momentum Technologies is commissioning what it claims is the world’s first dual-track demonstration plant near Dallas able to process both rare earth elements and lithium-ion battery materials using its proprietary membrane solvent extraction (MSX) system. MSX replaces football-field-scale solvent extraction circuits and kerosene with compact membrane reactors operating at moderate temperature and pressure, designed to cut footprint, energy use and time-to-commission for REE and battery-material refineries. The company is also progressing a 2,000 t/y commercial battery materials plant in Ohio and says its technology could ultimately support 20–50% of US rare earth processing capacity.

    Epiroc MT65 S trucks at Pucobre: haulage design and fleet renewal notes for engineers
    Mining
    10 months ago

    Epiroc MT65 S trucks at Pucobre: haulage design and fleet renewal notes for engineers

    Delivery of five 65 t class Epiroc Minetruck MT65 S units to Pucobre’s Tierra Amarilla operations in Chile’s Atacama Region marks the start of a 22-truck underground fleet renewal programme. The high-capacity trucks will operate in Pucobre’s narrow-vein copper mines, where ramp geometry, ground conditions and ventilation constraints make payload-to-power ratios and braking performance critical. For mine planners and maintenance teams, the staged introduction allows progressive optimisation of haul profiles, workshop layouts and spares strategies around a single, standardised 65 t truck platform.

    FLS appoints Toni Laaksonen as CEO: service-led focus for mine project teams
    Mining
    10 months ago

    FLS appoints Toni Laaksonen as CEO: service-led focus for mine project teams

    FLSmidth has appointed Toni Laaksonen as CEO with immediate effect, elevating him from his role as Service Business Line President, which he assumed in June 2025. He replaces Mikko Keto, who notified the Board in November 2025 of his decision to leave for an external opportunity. The move places a service-focused leader in charge of the OEM at a time when miners are prioritising brownfield optimisation, aftermarket support and performance-based service contracts for grinding, flotation and digital process equipment.

    • Previous
    • 1
    • More pages332
    • 333
    • 334
    • More pages408
    • Next
    AllGeotechnicalInfrastructureHazardsEnvironmental