Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Standard/Guideline
    Sustainability

    WA government–industry alignment for 2026: permitting and design notes for engineers

    December 17, 2025|

    Reviewed by Tom Sullivan

    WA government–industry alignment for 2026: permitting and design notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Collaboration between Western Australian mining industry bodies and local government is being strengthened ahead of 2026 to manage shifting regulatory, workforce and infrastructure demands. Stakeholders are aligning on issues such as approvals timeframes for new pits and tailings facilities, skills pipelines for autonomous haulage and remote operations centres, and long-term planning for regional roads and power networks servicing major iron ore and lithium hubs. For engineers, closer coordination could mean clearer permitting pathways, more predictable infrastructure funding, and earlier input into standards affecting pit design, waste storage and closure obligations.

    Technical Brief

    • Industry bodies are working directly with WA local governments rather than only via state-level departments.
    • Policy alignment is being framed around multi-decade mine life and closure obligations, not single approvals.
    • For similar jurisdictions, the WA process offers a template for synchronising mine design and regional planning.

    Our Take

    Western Australia dominates our Policy coverage within Australia, and 2026-dated pieces often relate to staged implementation of new standards, so operators should assume multi‑year compliance ramps rather than one‑off rule changes.

    Among the 46 Policy stories in our database, those tagged with both ‘Standard/Guideline’ and ‘Sustainability’ frequently precede tighter project approvals, suggesting WA proponents may face more prescriptive ESG conditions on new and expanded projects by 2026.

    Because this is framed at the state level rather than by commodity or asset, it signals that any WA project pipeline updates through 2026 will likely need to reference these aligned government–industry frameworks in their feasibility and permitting strategies.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    ISA seabed mining rules: benefit-sharing deadlock explained for project teams
    Policy
    3 days ago

    ISA seabed mining rules: benefit-sharing deadlock explained for project teams

    Deep seabed mining remains legally blocked after legal scholars Aline Jaeckel and Erik van Doorn argued that the International Seabed Authority cannot approve exploitation in areas like the Clarion-Clipperton Zone until separate benefit-sharing regulations, controlled by the ISA Assembly, are adopted. The ISA’s Finance Committee only produced a first draft benefit-sharing framework in 2024, centred on a Common Heritage Fund, while about 40 countries now support a moratorium and African states oppose using shared funds for remediation. Companies including The Metals Company, Impossible Metals and Lockheed Martin are advancing CCZ plans despite this regulatory deadlock.

    UK boom lifts anti-dumping probe: procurement and safety notes for engineers
    Policy
    11 days ago

    UK boom lifts anti-dumping probe: procurement and safety notes for engineers

    An anti-dumping and anti-subsidy investigation has been opened by the UK Trade Remedies Authority into Chinese-made boom lifts, following a complaint from UK manufacturer Niftylift. The probe covers telescopic and articulated boom lifts, including sub-assemblies, with working heights of 6 m and above, such as models like the Dingli BT44HRT now entering the UK market. Scissor lifts, forklifts, vertical mast lifts, mobile self-propelled cranes and motor vehicles with integrated boom or scissor assemblies are explicitly excluded, so procurement teams must check machine classifications carefully.

    Engineers Against Poverty chair: governance, carbon and cost lessons for project teams
    Policy
    11 days ago

    Engineers Against Poverty chair: governance, carbon and cost lessons for project teams

    Engineers Against Poverty chair Richard Threlfall calls for the engineering, infrastructure and construction profession to lead on cutting whole‑life emissions and controlling capital cost overruns in major civils programmes. He argues that effective infrastructure governance must move beyond compliance to active stewardship of carbon, cost and social outcomes, with engineers shaping procurement models and performance metrics rather than leaving them to financiers and policymakers. For practitioners, this signals greater responsibility for transparent cost baselines, carbon accounting and value-for-money evidence on large public works.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.