Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability

    Victory’s North Stanmore yttrium uplift: leach design notes for mine planners

    April 1, 2026|

    Reviewed by Joe Ashwell

    Victory’s North Stanmore yttrium uplift: leach design notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has reported “exceptional” metallurgical leaching results from its 100 per cent-owned North Stanmore heavy rare earth project in Western Australia, with a particular uplift in yttrium recoveries. The company is advancing column leach tests and optimisation of acid consumption after earlier bottle-roll work, targeting a clay-hosted rare earth system amenable to low-cost in-situ or heap leach-style processing. For geometallurgy and mine design, the results point to potential simplification of beneficiation flowsheets and greater emphasis on leach pad hydrology and solution management rather than complex concentrator circuits.

    Technical Brief

    • Bottle-roll leach tests were conducted on clay-rich drill samples from Victory’s North Stanmore project.
    • Testwork focused on heavy rare earth element deportment within ion-adsorbed clay horizons rather than hard-rock mineralisation.
    • Acid leach conditions are being tuned to balance extraction efficiency against reagent consumption and neutralisation requirements.
    • Column leach trials are being designed to better simulate vertical percolation, solution residence time and drainage behaviour in-situ.
    • Geometallurgical domaining is concentrating on clay thickness, permeability and exchangeable REE content to guide future drilling.
    • Victory is assessing whether in-situ leach patterns or stacked heap configurations best suit the near-surface clay geometry.
    • Environmental permitting will hinge on containment of acidic raffinate, groundwater protection and clay slope stability under leach conditions.
    • Outcomes will influence mine scheduling, haulage fleet sizing and whether any upfront mechanical beneficiation is retained.

    Our Take

    Across our coverage of Victory Metals’ North Stanmore work since early 2026, the project has progressively added value levers beyond clay-hosted rare earths alone, with hafnium and now yttrium signalling a multi-element revenue stack that can materially improve project economics in WA’s competitive rare earths space.

    The earlier partnership with Curtin University’s Western Australian School of Mines positions North Stanmore well to optimise processing routes for heavy rare earth and yttrium recovery, which is critical given the metallurgical complexity typically seen in clay-hosted systems in WA.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 9 hours ago

    Battery and electric vehicles in mining: design and power notes for engineers

    Electrification of mining fleets is advancing beyond early pilots, with battery-electric haul trucks, loaders and light vehicles moving from trial phases into multi-year deployment contracts despite recent pull-backs in some OEM roadmaps. Dan Gleeson details how mines are pairing 6–8 MWh battery trucks with on-site fast-charging bays and trolley-assist lines, and integrating underground BEVs with upgraded 11 kV substations and ventilation recalculations. Operators are reassessing mine plans, ramp gradients and power quality to manage peak loads, charger placement and heat rejection from high-capacity battery systems.

    Mining
    about 10 hours ago

    Metso Robotic Split Strip: cathode stripping design notes for copper plant engineers

    Metso has launched the Outotec Robotic Split Strip, a compact hydraulic‑robotic system for separating copper cathode sheets from mother plates in electrorefining circuits, designed for both greenfield and brownfield plants. The unit uses robotic handling and flexible tooling to improve stripping precision and reduce sheet damage and copper waste compared with conventional mechanical strippers. For plant engineers, the modular layout and automation focus allow retrofit into existing cells with minimal footprint, supporting tighter process control and more consistent cathode quality.

    Mining
    about 12 hours ago

    Aggreko–Harmony Eva copper hybrid plant: power and pit planning notes for engineers

    Aggreko has signed a minimum 15‑year power purchase agreement with Harmony Gold to build and operate what is described as Australia’s largest off‑grid renewable hybrid power facility for the Eva copper project in northwest Queensland. The build‑own‑operate arrangement will combine on‑site renewables with thermal generation and battery storage to supply continuous power to the remote open‑pit operation. For mine planners and process engineers, the long‑term PPA locks in a dedicated low‑emission power source, influencing pit expansion options, processing throughput and future electrification of mobile fleets.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.