Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Victory Metals rare earths breakthrough: processing and cost lens for mine planners

    January 15, 2026|

    Reviewed by Joe Ashwell

    Victory Metals rare earths breakthrough: processing and cost lens for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has reported “breakthrough metallurgical results” from its North Stanmore rare earths project in Western Australia, described as one of the largest clay-hosted rare earth deposits in the country. Testwork on the ionic clay mineralisation indicates significantly improved rare earth recoveries using relatively simple leach conditions, pointing to lower acid consumption and shorter residence times than hard-rock counterparts. For process engineers and mine planners, the results suggest potential for lower capital-intensity heap or tank leach circuits and more competitive operating costs if scaled successfully.

    Technical Brief

    • North Stanmore is described as one of Australia’s largest clay‑hosted rare earth deposits.
    • Mineralisation is ionic clay–hosted, implying desorption‑type leaching rather than hard‑rock cracking and dissolution.
    • Victory Metals reports the leach conditions as “relatively simple”, suggesting ambient‑temperature, low‑pressure processing routes.
    • Improved leach kinetics point to shorter residence times, enabling smaller tank volumes or thinner heap lifts.
    • Lower acid demand directly reduces reagent storage, transport and containment infrastructure on site.
    • Simpler hydrometallurgy lowers front‑end capital intensity versus conventional hard‑rock rare earth concentrators and refineries.
    • Clay‑hosted geometry typically supports shallow open‑cut mining with low strip ratios and flexible pit staging.
    • Similar ionic clay systems globally have enabled modular plant deployment and staged capacity increases with limited rework.

    Our Take

    Rare earths pieces in our database are still a small subset of the 633 Mining stories, so Victory Metals’ North Stanmore project in Western Australia sits in a relatively uncluttered local peer group compared with gold or iron ore developments.

    Western Australia rare earths projects in our coverage often face long lead times around processing route selection and reagent supply, so any genuine ‘breakthrough’ at North Stanmore could materially de‑risk downstream flowsheet design rather than just the resource story.

    With 36 keyword‑matched rare earths items in our database, most Australian examples are controlled by larger incumbents, meaning a successful technical step at Victory Metals could make it a more likely target for offtake discussions or JV interest once scale and metallurgy are proven.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Magmatic’s Myall diamond drilling: design and resource implications for mine planners
    Mining
    about 4 hours ago

    Magmatic’s Myall diamond drilling: design and resource implications for mine planners

    Exploration activity across Australia’s resources sector this week includes Magmatic Resources commencing diamond drilling at its Myall copper–gold project in New South Wales, targeting deeper porphyry-style mineralisation beneath previous RC intercepts. Parallel campaigns involve new drill programmes and project development steps at multiple sites, signalling continued spend on brownfield extensions and greenfield targets despite cost pressures. Geotechs and mine planners should watch for updated resource models and potential shifts in pit-shells or underground designs as deeper porphyry and structurally controlled zones are tested.

    Golden Pole high-grade boosts Waihi: design and scheduling notes for mine planners
    Mining
    about 5 hours ago

    Golden Pole high-grade boosts Waihi: design and scheduling notes for mine planners

    High-grade gold intercepts from Ora Banda Mining’s Golden Pole deposit are boosting the underground potential of the Waihi project near Kalgoorlie, with targeted follow-up drilling extending mineralisation along strike and at depth. The company is focusing on narrow, high-grade lodes accessible from existing underground development, aiming to convert recent hits into JORC-compliant resources and near-term ore feed for the Davyhurst processing plant. For geotechs and mine planners, the results point to deeper stoping fronts, tighter ground control requirements and potential schedule changes for underground access development.

    Austral–Glencore Lady Loretta copper deal: planning and geotechnical notes for mines
    Mining
    about 5 hours ago

    Austral–Glencore Lady Loretta copper deal: planning and geotechnical notes for mines

    Austral Resources has agreed to acquire Glencore AG’s Lady Loretta underground copper mine in north-west Queensland, adding a high-grade sulphide operation to its existing heap leach–SX/EW oxide business at Anthill. The Lady Loretta asset, previously a major zinc–lead–silver producer near Mount Isa, includes established underground workings, a decline, ventilation infrastructure and a permitted mining lease, giving Austral a second ore source within trucking distance of regional concentrators. The deal signals a shift towards a mixed oxide–sulphide portfolio, with implications for new concentrator offtake, mine planning and geotechnical management of deeper stopes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.