Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Standard/Guideline
    Projects

    Treasury’s renewed Green Book: appraisal shifts explained for project engineers

    February 6, 2026|

    Reviewed by Joe Ashwell

    Treasury’s renewed Green Book: appraisal shifts explained for project engineers

    First reported on New Civil Engineer

    30 Second Briefing

    The UK Treasury has issued a slimmed‑down Green Book, revising the appraisal rules that govern billions of pounds of public investment in transport, flood defences and other major infrastructure. The update is intended to give “overlooked” regions a stronger case in cost‑benefit analysis by rebalancing how wider economic impacts, distributional effects and place‑based regeneration are valued alongside pure benefit–cost ratios. Civil and geotechnical schemes in lower‑income or lower‑productivity areas could now score better in business cases for road upgrades, rail links and resilience works.

    Technical Brief

    • New guidance is framed as changing how ministers assess and compare public investment options at spending reviews.
    • Over time, the change is likely to alter scheme ranking within regional investment pipelines, reshaping which projects proceed to design.

    Our Take

    HM Treasury’s role in both the renewed Green Book and the Lower Thames Crossing’s regulated asset base (RAB) model signals a push to standardise how long-lived infrastructure risk and value are appraised, which will matter for any project in ‘overlooked’ areas trying to justify higher upfront public support.

    Our database shows Treasury-linked pieces ranging from the Darlington Economic Campus hub to Amey’s calls for long-term infrastructure funding, suggesting that practitioners should treat the updated Green Book as the reference point when framing business cases around productivity, regional rebalancing and net zero rather than narrow cost–benefit alone.

    For contractors and consultants bidding into Government Property Agency or National Highways pipelines, aligning appraisal assumptions and distributional analysis with the renewed Green Book will likely become as important as price, because central sign-off on schemes in less prosperous regions will lean heavily on those revised metrics.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brazil survey plan: access, data priority and licence risks for mine planners
    Policy
    about 16 hours ago

    Brazil survey plan: access, data priority and licence risks for mine planners

    Brazil’s Geological Survey (SGB) is advancing a 10‑year, 3.3‑billion‑real airborne geophysical survey plan that could grant co‑funders such as Petrobras and Vale temporary exclusive access to magnetics and conductivity data before it becomes public. Because Brazil’s Mining Code awards exploration rights to the first qualifying applicant, early access to regional datasets could let major backers secure prime copper, gold, iron ore, lithium and rare earths ground ahead of juniors. Industry groups including ABPM are pushing for strict safeguards, seeking exclusivity capped at six months, limited to co‑funded areas and with no mineral rights priority attached.

    Greenland seabed mining ban to 2029: project siting implications for engineers
    Policy
    4 days ago

    Greenland seabed mining ban to 2029: project siting implications for engineers

    Greenland’s parliament has unanimously backed a resolution to ban seabed mineral extraction until at least the end of 2029, with possible two‑year extensions, directly countering US plans for “massive oil, gas and mineral exploration” announced by President Trump. The ban will cover prospective deep-sea mining of polymetallic nodules and other seabed resources, even as the US moves towards permitting such operations in international waters. For miners eyeing Greenland’s 28.2 Mt TREO Tanbreez rare earth project and wider critical mineral endowment, the decision sharply narrows options to land-based developments.

    Canada’s new foreign investment rules: financing impacts for critical minerals projects
    Policy
    4 days ago

    Canada’s new foreign investment rules: financing impacts for critical minerals projects

    Canada’s 2024 Investment Canada Act amendments will, from early 2027, impose mandatory pre-closing filings on certain non-control foreign investments in “prescribed” sensitive sectors, expected to include critical minerals, where investors gain access to material non-public technical information, key assets or governance rights. Critical minerals juniors relying on strategic minority investors for exploration, feasibility and project build-out may face at least a 45-day national security screening, with some reviews extending to 200 days, forcing longer financing timelines and more complex deal structuring, such as staged tranches. Ottawa’s aim is to vet sensitive deals before closing and avoid repeat divestiture orders like the 2022 forced exits of Sinomine, Chengze Lithium and Zangge Mining from Canadian lithium and rare metals projects.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental