Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Top 10 gold mining companies of 2025: portfolio and project notes for engineers

    February 26, 2026|

    Reviewed by Joe Ashwell

    Top 10 gold mining companies of 2025: portfolio and project notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Gold’s 40% price surge in 2025 and a 155% jump in the VanEck Gold Miners ETF reshaped the producer rankings, with Newmont still number one despite a 14% output drop and asset sales, and Agnico Eagle moving into second after exceeding its production guidance and acquiring O3 Mining. Barrick’s volumes slumped after the Loulo-Gounkoto complex in Mali was suspended and only restarted in December, while Zijin boosted output 35% with acquisitions including Akyem in Ghana and Raygorodok in Kazakhstan. Northern Star hit guidance and closed a A$5 billion De Grey takeover targeting up to 3 Moz/y, but has already cut its fiscal 2026 outlook.

    Technical Brief

    • Newmont’s 2025 milestones included commercial production at the Ahafo North project in Ghana.
    • Asset rationalisation at Newmont involved divesting several non-core operations while still meeting annual guidance.
    • Agnico Eagle’s acquisition of O3 Mining is targeted at strengthening the Canadian Malartic complex’s long-term feed.
    • Additional Agnico capital deployment went into equity positions in Perpetua Resources and multiple Canadian juniors.

    Our Take

    The 155% gain in the VanEck Gold Miners ETF (GDX) against a 40% bullion rise in 2025 implies strong leverage to producers like Newmont, Barrick and Agnico Eagle Mines, but also means portfolio risk is now heavily concentrated in a handful of large-cap names dominating this ranking.

    Recent coverage of Newmont’s dispute with Barrick over Nevada Gold Mines and its post-Newcrest capex plans suggests that JV governance and integration risk could be as important as orebody quality in determining which of these top 10 gold groups sustain their 2025 production positions over the next three years.

    With Northern Star Resources and Gold Fields each executing multi‑billion‑dollar Australian transactions (De Grey Mining and Gold Road Resources respectively), our database shows Australia emerging as the most transaction‑active gold jurisdiction, signalling that scale in that market is becoming a prerequisite for remaining in the global top tier.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners
    Mining
    about 19 hours ago

    pH7 Technologies’ closed-loop PGM and chalcopyrite leaching: key notes for mine planners

    Canadian processor pH7 Technologies is expanding its Vancouver facility, backed by up to C$4 million from NRC IRAP, to scale its organo-electrochemical platform that recovers platinum, palladium and rhodium from secondary materials without toxic reagents or tailings wastewater. The commercial plant already processes spent catalytic converters, producing 30,000–40,000 oz of platinum-equivalent PGMs per year under a tolling and offtake model involving partners such as Mitsubishi. pH7 is now piloting electrochemically generated oxidants to heap leach chalcopyrite and other sulphide ores without cyanide, targeting on-site mine deployment within 1–2 years across South America, Africa and Australia.

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers
    Mining
    about 23 hours ago

    Dellner Bubenzer mining brakes: integrated drivetrain design notes for engineers

    Dellner Bubenzer is supplying a wide range of industrial brakes and couplings for mining hoists, slewing drives and belt conveyors, developed in long-term collaboration with OEMs. The company focuses on both service and emergency braking solutions tailored to heavy-duty mining duty cycles and harsh environments, addressing controlled hoisting, precise slewing and high-tension conveyor stopping. For engineers, the key point is an integrated approach to drivetrain and braking design, rather than bolt-on safety systems, across multiple critical mining applications.

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers
    Mining
    1 day ago

    SKRI ‘phytocapture’ at Raygorodok: dust control performance insights for mine engineers

    China’s Zijin Mining is expanding RG Gold’s Raygorodok operation in Kazakhstan with a $500 million processing plant while deploying SKRI’s ‘phytocapture’ system, planting over 100,000 Scots pines across more than 20 hectares about 1.7 km downwind of the open pit. Supercomputer modelling using regional wind-rose data sets tree species and spacing to form multilayered vegetative barriers, not simple landscaping. SKRI reports particulate-matter reductions above 40%, with the forest belt expected to capture roughly one-third of dust emissions as mining advances towards the barrier.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy