Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Product
    Sustainability

    Smarter filtration solutions: dewatering and tailings design notes for plant engineers

    April 16, 2026|

    Reviewed by Tom Sullivan

    Smarter filtration solutions: dewatering and tailings design notes for plant engineers

    First reported on Australian Mining

    30 Second Briefing

    Smarter filtration solutions in wet mineral processing are focusing on high-pressure tower filter presses for slurry dewatering, such as Thejo’s vertical plate designs that deliver low-moisture filter cakes and high filtrate recovery. Suppliers are pairing these presses with automated cloth washing, cake discharge monitoring and optimised cycle control to stabilise throughput and reduce unplanned downtime. For plant designers, the shift is towards integrating filtration with upstream thickening and downstream dry stacking to cut fresh water intake and tailings storage volumes.

    Technical Brief

    • Thejo’s tower filter presses apply high feed pressures to handle fine, hard-to-dewater mineral slurries.

    Our Take

    Australian Mining’s recent product coverage in Australia spans everything from MASPRO’s supply-chain resilience for crusher parts to XCMG’s battery-electric fleets, so filtration offerings from Thejo are entering an audience already primed to link equipment choices with uptime and decarbonisation outcomes.

    For Australian METS suppliers highlighted in our coverage, such as those being pushed by Austmine to target the US market, advanced filtration solutions from firms like Thejo could be bundled into export offerings as a relatively low-capex way for overseas mines to hit ESG and water-management targets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers
    Mining
    about 17 hours ago

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers

    MAX Power Mining has signed an MOU with the City of Moose Jaw, Saskatchewan, to advance natural hydrogen commercialisation in the Regina–Moose Jaw Industrial Corridor, centred on the Lawson Natural Hydrogen system near Central Butte, about 80 km northwest of the city. Core desorption tests from nine samples in Cambrian Basal sands above the Basement Complex discovery returned helium values up to 8.7%, averaging 4.4%, indicating a potentially valuable hydrogen–helium system. The partners aim to leverage existing regional infrastructure and policy support to move the project towards commercial validation.

    Water shortages and mining projects: schedule and design takeaways for engineers
    Mining
    about 18 hours ago

    Water shortages and mining projects: schedule and design takeaways for engineers

    Water scarcity and multi‑year permitting delays—often two to four years for discharge and dewatering approvals in the western US—are increasingly stalling otherwise bankable mines, with water risk now affecting project schedules, financing and national credit profiles. Consultants such as Woodard & Curran report that “credible water stories” are becoming as critical as ore grades, pushing operators towards closed‑loop recycling and non‑traditional sources. US firms Genesis Systems and Atoco are deploying atmospheric water generation units, including Genesis’ containerised WaterCube systems producing over 1,000 gallons per day off‑grid, now trialled at mine sites.

    Nouveau Monde’s Matawinie graphite mine: capex, schedule and offtake lens for engineers
    Mining
    about 21 hours ago

    Nouveau Monde’s Matawinie graphite mine: capex, schedule and offtake lens for engineers

    Nouveau Monde Graphite has approved construction of the Matawinie open-pit mine in Saint-Michel-des-Saints, Quebec, designed to produce about 106,000 tonnes per year of graphite concentrate over more than 25 years and powered by the provincial hydroelectric grid. The company has secured roughly $644.5 million in equity and debt, with total capex for Matawinie and the Bécancour battery material plant now estimated at about $634 million after downsizing the plant from the 2025 feasibility study. A 30‑month build is planned to reach full production by end‑2028, with 75% of output under offtake, including a seven‑year, 30,000‑t/y fixed‑price contract with the Government of Canada.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental