Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers

    December 14, 2025|

    Reviewed by Tom Sullivan

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Ionic Mineral Technologies reports its Silicon Ridge project in Utah is a halloysite-hosted ion-adsorption clay system grading about 2,700 ppm (0.27%) combined rare earths and critical metals from 106 boreholes over 10,000 m and 35 trenches across 650 acres, exceeding typical Chinese IAC grades of 500–2,000 ppm. The confirmed mineralisation currently covers only 11% of the resource area to 100 ft depth, with existing mining permits and a 74,000 ft² Provo processing plant enabling rapid start-up. Ionic MT plans a vertically integrated flowsheet producing three co-product streams—critical minerals (including gallium, germanium, scandium, lithium and tungsten), high-purity alumina and nano-silicon—with a preliminary economic assessment due in H1 2026.

    Technical Brief

    • Silicon Ridge is characterised as a halloysite-hosted ion-adsorption clay system rather than hard rock.
    • Ionic MT describes the mineralisation as “IAC-Plus”, reflecting magmatic enrichment in multiple critical elements.
    • Critical metals identified include gallium, germanium, rubidium, caesium, scandium, lithium, vanadium, tungsten and niobium.

    Our Take

    With Silicon Ridge hosting 16 different elements and a combined grade of 0.27%, the key technical question will be whether Ionic MT’s processing facility in Provo can economically separate multiple value streams, rather than relying on a single flagship product like lithium or rare earths alone.

    The comparison to Chinese ion-adsorption clay deposits (500 ppm and above, supplying 35–40% of China’s rare earths and over 70% of heavy rare earths) signals that any scalable success at Silicon Ridge in Utah would be strategically significant for US supply chains, especially for heavy rare earth elements that currently have few non-Chinese sources in our database.

    Only a subset of the 650-acre Silicon Ridge project has confirmed grades down to 100 feet (11% of the resource area), so near-term work is likely to focus on tightening the resource model and demonstrating continuity at depth before the first-half-2026 timeline becomes realistic for larger-scale development decisions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 10 hours ago

    Fluor and WSP on USA Rare Earth’s Round Top: design and risk notes for mine teams

    USA Rare Earth Inc has appointed Fluor Corp and WSP Global Inc as EPCM partners to advance the definitive feasibility study for its Round Top rare earth project in Texas, targeting heavy rare earths and critical magnet materials. The mandate covers process plant, mine infrastructure and associated large-scale infrastructure delivery, drawing on Fluor’s mining and processing design capability and WSP’s experience in complex project execution. For geotechnical and civil teams, early EPCM involvement signals imminent definition of pit design, waste storage, haul roads and water management concepts ahead of permitting and financing.

    Mining
    about 11 hours ago

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Argent high-grade silver and peers: exploration takeaways for mine planners
    Mining
    about 20 hours ago

    Argent high-grade silver and peers: exploration takeaways for mine planners

    Exploration activity across Australia this week includes Argent Minerals reporting high-grade silver intercepts at its Kempfield project in New South Wales, with mineralisation extending along strike from existing volcanogenic massive sulphide-style resources. Kalamazoo Resources advanced drilling at its gold targets in the Pilbara and Central Victorian Goldfields, focusing on structurally controlled lodes near historic workings and testing down-dip extensions below old stopes. Adelong Gold continued resource-definition work at the Adelong project in NSW, targeting shear-hosted quartz veins to upgrade JORC classifications and refine pit and underground designs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.