Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers

    December 14, 2025|

    Reviewed by Tom Sullivan

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Ionic Mineral Technologies reports its Silicon Ridge project in Utah is a halloysite-hosted ion-adsorption clay system grading about 2,700 ppm (0.27%) combined rare earths and critical metals from 106 boreholes over 10,000 m and 35 trenches across 650 acres, exceeding typical Chinese IAC grades of 500–2,000 ppm. The confirmed mineralisation currently covers only 11% of the resource area to 100 ft depth, with existing mining permits and a 74,000 ft² Provo processing plant enabling rapid start-up. Ionic MT plans a vertically integrated flowsheet producing three co-product streams—critical minerals (including gallium, germanium, scandium, lithium and tungsten), high-purity alumina and nano-silicon—with a preliminary economic assessment due in H1 2026.

    Technical Brief

    • Silicon Ridge is characterised as a halloysite-hosted ion-adsorption clay system rather than hard rock.
    • Ionic MT describes the mineralisation as “IAC-Plus”, reflecting magmatic enrichment in multiple critical elements.
    • Critical metals identified include gallium, germanium, rubidium, caesium, scandium, lithium, vanadium, tungsten and niobium.

    Our Take

    With Silicon Ridge hosting 16 different elements and a combined grade of 0.27%, the key technical question will be whether Ionic MT’s processing facility in Provo can economically separate multiple value streams, rather than relying on a single flagship product like lithium or rare earths alone.

    The comparison to Chinese ion-adsorption clay deposits (500 ppm and above, supplying 35–40% of China’s rare earths and over 70% of heavy rare earths) signals that any scalable success at Silicon Ridge in Utah would be strategically significant for US supply chains, especially for heavy rare earth elements that currently have few non-Chinese sources in our database.

    Only a subset of the 650-acre Silicon Ridge project has confirmed grades down to 100 feet (11% of the resource area), so near-term work is likely to focus on tightening the resource model and demonstrating continuity at depth before the first-half-2026 timeline becomes realistic for larger-scale development decisions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Lynas Malaysian licence and profit surge: supply and residue risks for engineers
    Mining
    about 2 hours ago

    Lynas Malaysian licence and profit surge: supply and residue risks for engineers

    Lynas Rare Earths has secured a 10‑year operating licence for its Kuantan rare earths processing plant in Pahang, Malaysia, locking in long-term capacity for cracking and separation of neodymium-praseodymium and other light rare earth oxides. The approval follows earlier regulatory pressure over low-level radioactive waste from lanthanide concentrate and conditions on waste management and residue storage imposed by Malaysia’s Atomic Energy Licensing Board. The extended licence, combined with a reported profit surge, reduces near-term risk to Lynas’ supply chain while its Kalgoorlie cracking and leaching plant in Western Australia ramps up.

    Victoria antimony processing push: project and offtake signals for mine planners
    Mining
    about 2 hours ago

    Victoria antimony processing push: project and offtake signals for mine planners

    Victoria’s Government has launched a program to expand domestic critical mineral processing, targeting antimony from the Costerfield mine near Heathcote and other Victorian deposits to reduce reliance on Chinese and Russian supply. The initiative focuses on downstream processing capacity rather than new extraction, aiming to convert locally mined antimony into higher-value products such as antimony trioxide and flame-retardant masterbatches. For miners and processors, this signals potential support for new concentrators, refining circuits and offtake arrangements tied to onshore value-adding.

    Sustainable Fitch affirms Navoi Mining ESG rating: capital and risk notes for mine planners
    Mining
    about 2 hours ago

    Sustainable Fitch affirms Navoi Mining ESG rating: capital and risk notes for mine planners

    Sustainable Fitch has reaffirmed Navoi Mining and Metallurgical Company’s ESG entity rating at ‘3’ with an overall score of 54/100, up from 51, while upgrading its environmental profile to ‘2’ after the Uzbek gold producer disclosed Scope 2 emissions and set time-bound targets to cut combined Scope 1 and 2 emissions by 10% by 2030 from 2024 levels. The social profile remains at ‘3’ with no reported labour or community incidents and stable employment, while governance stays at ‘2’ on the back of detailed financial reporting and a formal risk and tax compliance framework. For mine planners and project financiers, the rating trajectory and absence of recorded environmental incidents may support access to ESG-linked capital and influence permitting and stakeholder engagement strategies in Uzbekistan.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.