Geomechanics.io

  • Free Tools
Sign UpLog In
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Lynas Malaysian licence and profit surge: supply and residue risks for engineers

    March 2, 2026|

    Reviewed by Joe Ashwell

    Lynas Malaysian licence and profit surge: supply and residue risks for engineers

    First reported on Australian Mining

    30 Second Briefing

    Lynas Rare Earths has secured a 10‑year operating licence for its Kuantan rare earths processing plant in Pahang, Malaysia, locking in long-term capacity for cracking and separation of neodymium-praseodymium and other light rare earth oxides. The approval follows earlier regulatory pressure over low-level radioactive waste from lanthanide concentrate and conditions on waste management and residue storage imposed by Malaysia’s Atomic Energy Licensing Board. The extended licence, combined with a reported profit surge, reduces near-term risk to Lynas’ supply chain while its Kalgoorlie cracking and leaching plant in Western Australia ramps up.

    Technical Brief

    • For other rare earth processors, Lynas’ licensing pathway reinforces the need for early, transparent NORM management strategies.

    Our Take

    Lynas Rare Earths also features in our coverage of rare earths’ role in trade negotiations, where Wood Mackenzie notes China’s dominance in refined supply; a 10‑year Malaysian operating licence gives Lynas unusual long-term certainty compared with many non-Chinese peers facing shorter or more conditional permits.

    The new decade-long licence in Malaysia directly addresses concerns raised in another related piece where Jake Klein criticises Australia’s failure to secure downstream rare earths processing, signalling that Lynas is likely to keep most value-added processing offshore rather than repatriating it to Australia in the medium term.

    Among our 71 rare-earths keyword-matched pieces, few operators have locked in comparable multi-year processing security outside China, so this Malaysian tenure stability could make Lynas a preferred counterpart for OEMs and governments seeking non-Chinese magnet feedstock contracts.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers
    Mining
    1 day ago

    MetalQuest’s Lac Otelnuk iron project: economics and infrastructure lens for engineers

    MetalQuest Mining’s Lac Otelnuk project in northern Quebec hosts 4.9 billion tonnes of proven and probable reserves grading 28.7% Fe, with a 2015 feasibility study outlining an 11.6 km by 2.8 km open pit, post-tax NPV of US$5.24 billion (8% discount), IRR of 13% and capital costs of about US$14.2 billion. The study forecasts 68.5% Fe concentrate with 0.02% P and 2.95% SiO₂, positioning it for DRI-based low-emission steelmaking using Quebec hydro power. Infrastructure remains the critical constraint, with a previously proposed 755 km concentrate slurry pipeline to Sept-Îles now likely to be replaced by road and rail, and MetalQuest seeking a major partner ahead of a new feasibility targeted for 2030.

    Mining
    2 days ago

    XCMG–Codelco MoU: haul fleet competition and design notes for Andean copper mines

    XCMG has signed a memorandum of understanding with Chilean copper major Codelco in Santiago on 3 March, following Codelco Chairman Máximo Pacheco’s visit to XCMG’s Xuzhou manufacturing base in February. The agreement, signed by XCMG Vice President Liu Jiansen and Codelco Chief Procurement Officer Mauricio Acuña, centres on expanding supply of large-scale mining equipment and support services to Codelco’s open-pit and underground copper operations. For engineers, the deal signals intensifying competition with established OEMs on haul trucks, loaders and drilling fleets in high-altitude Andean conditions.

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers
    Mining
    2 days ago

    Oklahoma critical minerals refining push: infrastructure and power notes for engineers

    Oklahoma is positioning itself as a critical minerals processing hub rather than a mining state, anchored by Emirates Global Aluminium’s proposed US$4 billion primary aluminium smelter at the Port of Inola on the McClellan–Kerr Arkansas River system and backed by surplus low‑cost power from wind and natural gas. USA Rare Earth is building a vertically integrated rare earth magnet plant in Stillwater with about US$1.6 billion in public and private funding, while Stardust Power (NASDAQ: SDST) is advancing a lithium refinery in Muskogee with Sumitomo offtake and key permits secured. The cluster targets defence and aerospace demand around Tinker Air Force Base and other installations, aiming to plug the “missing middle” between raw mineral supply and finished components.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.